# Rancho California Water District Planet bids #RFB 265-2026

Diaz Road Facility Asphalt and Concrete Rehabilitation

**Posted:** November 05, 2026
**Respond By:** November 25, 2026
**Identifier:** RFB 265-2026
**NAICS:** 237310, 238990

Rancho California Water District Public Works seeks a contractor for asphalt and concrete rehabilitation at its Diaz Road Facility in Temecula.
- **Buyer:** Rancho California Water District, Public Works; Procurement department.
- **Work requested:**
  - Remove and replace approximately 16,510 square feet of asphalt, with 4-inch total compacted thickness of PG 70-10 hot-mix asphalt (HMA) in two lifts and SS-1h tack coat between lifts.
  - Mill and overlay approximately 7,150 square feet of asphalt with 2-inch compacted PG 70-10 HMA.
  - Remove and replace approximately 104 square feet (about 52 linear feet) of 6-inch concrete flowline at three locations, maintaining existing drainage and alignment.
- **OEMs:** None specified. No manufacturer or product vendor is identified for the paving materials.
- **Notable requirements:** Complete the work in two coordinated phases while maintaining safe, continuous access for businesses and heavy vehicles, including semi-trucks. Provide traffic control and a schedule; hold an applicable California Class A General Engineering or Class C-12 Earthwork and Paving license. Bid security is at least 10% of the bid, and performance and payment bonds are each 100% of the contract price. Liquidated damages are $500 per day.

### Description

Rancho California Water District is soliciting bids for asphalt pavement rehabilitation and concrete flowline replacement at its former headquarters facility at 28061 Diaz Road, Temecula, California. Work includes approximately 16,510 square feet of asphalt removal and replacement, 7,150 square feet of asphalt milling and overlay, and 104 square feet of concrete flowline replacement. The work is to be completed in two coordinated phases while maintaining safe, continuous access for businesses, commercial trucks, and deliveries. The project must be completed within 30 calendar days after contract award, with on-site construction completed within five consecutive calendar days after commencement.

[View original listing](https://vendors.planetbids.com/portal/39498/bo/bo-detail/148081)
