# Texas DIR/ESBD #0007577

Permian Basin Medical Center roadway, utilities, drainage, landscaping, and lighting construction

**Posted:** November 05, 2026
**Respond By:** December 15, 2026
**Identifier:** 0007577
**NAICS:** 237310, 237110, 238210, 238220, 238990, 238910

The Texas Facilities Commission is seeking a construction contractor for new roadways and supporting infrastructure at the Permian Basin Medical Center in Midland, Texas.
- **Buyer and location:** Texas Facilities Commission (TFC), for the Permian Basin Medical Center; near N. State Highway 349 and Texas State Highway 191 in Midland.
- **Project:** Permian Basin Beacon Roadways and Utilities Project, Solicitation 0007577 / Project 26-002-8111. Estimated value is $52.5 million.
- **Work requested:** Build three main roadways and related drainage, water and sewer networks, electrical and franchise utility infrastructure, landscaping, irrigation, and lighting. The proposal schedule includes an electrical lighting additive alternate.
- **Major quantities:** 51,855 SY of hot-mix asphalt roadway pavement, 13,990 SY of concrete pavement, 4,000 LF of 8-inch C-900 water line, 5,950 LF of 12-inch C-900 water line, 3,060 LF of 8-inch SDR-26 sanitary sewer, 5,400 LF of 12-inch SDR-26 sanitary sewer, and 143 #45 landscape trees.
- **Important scope boundary:** Asbestos abatement is excluded from this contract. The attachment does not identify OEMs, named vendors, or manufacturer part numbers.
- **Performance:** Construction is to start within 10 calendar days after Notice to Proceed; the projected contract term is 365 calendar days, subject to amendment or negotiation.

### Description

The Texas Facilities Commission is seeking proposals for construction of three new main roadways at the Permian Basin Medical Center, at N. State Hwy 349 and Texas State Hwy 191. The work includes associated landscaping, irrigation, lighting, and underground utilities to support future development. Construction must begin within 10 calendar days after the Notice to Proceed, and the projected contract term is 365 calendar days, subject to amendment or negotiation. Attendance at one of two mandatory pre-submittal teleconferences is required; proposals and the HSP are due December 15, 2026, at 3:00 PM.