# Bergen County Bonfire #BCUA -26-C214-R3

Installation of a pre-purchased modular chiller and related cooling-system upgrades

**Posted:** November 04, 2026
**Respond By:** November 19, 2026
**Identifier:** BCUA -26-C214-R3
**NAICS:** 238220, 238290

The BC Utilities Authority is seeking construction services to install a pre-purchased modular chiller and upgrade its control-building cooling systems.
- **Government buyer:** BC Utilities Authority (BCUA), a local authority in Bergen County, New Jersey; no specific sub-agency or office is identified.
- **Requested equipment:** Install one six-section modular chiller already purchased by the Authority. No OEM, model, or part number is specified.
- **Related work:** Install refrigerant detection and exhaust equipment; refurbish two existing cooling-tower cells through a manufacturer-approved restoration company; and complete required piping, ductwork, supports, and controls.
- **Key requirement:** Complete the work within 100 calendar days. The installed systems must meet the construction documents and applicable manufacturer requirements and result in a fully operational plant.
- **Vendors and manufacturers:** BCUA is the only named organization. No chiller OEM, restoration contractor, or other vendor is identified.

### Description

BCUA Contract No. C214 covers installation of a new six-section modular chiller pre-purchased by the Owner, in accordance with construction documents and manufacturer requirements. The work also includes a new refrigerant detection and exhaust system for existing and new refrigerants, and refurbishment of two existing cooling tower cells by a manufacturer-approved restoration company. Related work includes piping, ductwork, supports, and controls needed for a complete, operational plant. A walk-through is not required but is strongly recommended.

[View original listing](https://co-bergen-nj.bonfirehub.com/opportunities/260464)
