# SAM #SPRTA1-27-R-0057

F110 Turbine Nozzle and First-Article Procurement

**Buyer:** DLA AVIATION AT OKLAHOMA CITY, OK
**Posted:** November 05, 2026
**Respond By:** December 07, 2026
**Identifier:** SPRTA1-27-R-0057
**NAICS:** 336412

DLA is seeking F110 turbine nozzles and related first-article and reporting support for a safety-critical aircraft engine component.
- Buyer: Defense Logistics Agency (DLA), DLA Weapons Support at Oklahoma City, DLR Procurement Operations; the notice also identifies DLA Aviation at Oklahoma City. Related Air Force offices include 421 SCMS/GUMCB, AFLCMC/LPSBN, AFLCMC/LPSEB, and 406 SCMS/GULAA.
- Product: F110 turbine nozzle, NSN 2840-01-289-8529 / 2840012898529PR. Approved manufacturer part numbers are 9525M21 and 9525M21G02.
- Quantities and pricing alternatives: 1 expendable and 2 nonexpendable first articles; production pricing requested for 6 units with first articles and 6 without. Pricing is also requested for quantity ranges 1–6 and 7–12; the production requirement is 6. These are alternative solicitation scenarios, not quantities to add together.
- **OEM:** GE Aerospace (CAGE 07482) is named and exempt from the first-article requirement. The notice says only one source is qualified; no reseller or other vendor is named.
- Requirements: New sources require a SAR package and first-article testing. First articles are due within 180 days of award. This is a Critical Safety Item; IUID marking must use bag/tag only, with direct part marking prohibited, and marking must follow MIL-STD-130.
- Reporting: CEMS reporting is required for serially tracked engines and parts. U.S. contractor occurrence reports are due by close of business the next business day, with serially tracked assets updated whether repaired or newly produced. Separate procedures apply to Foreign Military Sales.
- Other conditions: Offerors must be approved and export-control certified to access drawings. The nozzle is made of Inconel and directs gaspath airflow onto Stage 2 low-pressure turbine blades while providing a mounting flange for the Stage 1 nozzle assembly.

### Description

<p>SAR package and First Article required for new sources. Only one qualified source.</p>
<br/><br/><br/><strong>Additional Links:</strong><br/><a href='https://sam.gov/workspace/contract/opp/453cb3197aed4d0095d4577f926f33a2/view' target='_blank'>TDP</a>

[View original listing](https://sam.gov/opp/18fb63772b1e4340bdf7b6bc82fe5c03/view)
