# Massachusetts COMMBUYS #BD-19-1212-MWRA-DITP-135121

Alford Street Facility Seawall Repair and Stabilization

**Posted:** November 04, 2026
**Respond By:** December 02, 2026
**Identifier:** BD-19-1212-MWRA-DITP-135121
**NAICS:** 237990

The Massachusetts Water Resources Authority is seeking construction services to repair and stabilize a critical section of the Alford Street Facility seawall in Charlestown.
- **Government buyer:** Massachusetts Water Resources Authority (MWRA), Procurement office.
- **Work requested:** Repair approximately 65 linear feet of seawall by filling voids between granite blocks and providing localized stabilization.
  - Protect an active 60-inch-diameter sewer and reduce future seawall displacement.
  - Stabilization is intended to provide an anticipated 10-year service life.
- **Quantity:** One construction-services item; no part number specified.
- **Estimated project cost:** $2,815,000.
- **Performance timeframe:** Estimated completion within 18 months after the Notice to Proceed.
- **OEMs and vendors:** None identified.

### Description

The Massachusetts Water Resources Authority seeks bids to repair a critical 65-linear-foot section of the Alford Street Facility seawall. Work includes filling voids between granite blocks and providing localized stabilization to reduce future displacement and safeguard an active 60-inch-diameter sewer, with an anticipated 10-year service life. The estimated project cost is $2,815,000, and completion is estimated at 18 months from the Notice to Proceed. The contract has MBE participation requirements of 7.24% and WBE participation requirements of 3.6%.

[View original listing](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1212-MWRA-DITP-135121&external=true&parentUrl=close)