# Georgia Procurement Registry #PE-65100-NONST-2027-000000057

Construction of a 1.5-million-gallon elevated water tank and related infrastructure

**Posted:** November 04, 2026
**Respond By:** December 10, 2026
**Identifier:** PE-65100-NONST-2027-000000057
**NAICS:** 237110, 237990

Effingham County is seeking a contractor to build a complete elevated water-storage facility and supporting water-supply infrastructure in Georgia.
- **Government buyer:** Effingham County Board of Commissioners; Effingham County, Georgia.
- **Scope:** Construct a complete, operational 1.5-million-gallon concrete composite elevated water tank, including its foundation, erection, site work, installation, testing, and closeout.
  - Related work includes site clearing and grading, gravel access areas, approximately 12-inch PVC water main, flanged piping, control valves, connection to an existing 16-inch water main, hydrant and gate-valve assemblies, and steel casing and jack-and-bore work.
  - Site improvements include chain-link fencing and gates, rip-rap, concrete work, erosion and sediment controls, and restoration.
  - Electrical, instrumentation, and SCADA scope includes service and equipment, panels, conduit, wiring, gauges, controls, grounding, lighting, and pressure instrumentation. Obstruction lighting may be required for FAA compliance.
- **Other requirements:** Tank coating and painting, lettering and logo installation, system disinfection and bacteriological testing, stormwater/NPDES monitoring and reporting, inspections, and regulatory and project closeout work.
- **OEMs and vendors:** No manufacturers, OEMs, or vendors are named; the contractor must furnish the required labor, materials, and equipment.
- **Period of performance:** Not specified in the provided information.

### Description

Effingham County is soliciting construction of a new 1.5-million-gallon concrete composite elevated water tank for its Regional Water Supply Facilities project. Work includes the tank foundation and erection, site work, piping, water-main connections, valves, hydrants, fencing, and site restoration. The project also includes electrical, instrumentation, and SCADA systems, tank coating and painting, disinfection and testing, and stormwater monitoring and reporting. The contractor must provide the labor, materials, equipment, testing, inspections, and closeout work needed to deliver a complete, operational facility.