# Quebec SEAO #2023-124-5

Rue Giguère Phase II and III municipal infrastructure construction

**Posted:** November 04, 2026
**Respond By:** December 07, 2026
**Identifier:** 2023-124-5
**NAICS:** 237310, 237110, 237990

The Ville de Val-d’Or is seeking bids for Phase II and III municipal infrastructure construction on rue Giguère.
- **Government buyer:** Ville de Val-d’Or, Service de l’ingénierie.
- **Requested work:** Construction extending from rue Duchesne southward, including site clearing and topsoil removal, groundwater drawdown and stormwater management, a retention basin and treatment unit, and extensions to drinking-water and sewer lines.
- **Roadwork:** Build a local road with curbs, sidewalks, and paving.
- **OEMs and vendors:** None named; no specific products, part numbers, or quantities are provided.

### Description

The Ville de Val-d'Or is seeking bids for municipal construction work on rue Giguère, from rue Duchesne southward, including a retention basin. Work includes site clearing, groundwater drawdown and stormwater management, construction of a retention basin and treatment unit, and extension of drinking-water and sewer services. The scope also includes road construction, curbs, sidewalks, and paving. Bids are due December 7, 2026, before 11:00 a.m. Quebec Legal Time, and the expected contract duration is 12 months, excluding options.

[View original listing](https://seao.gouv.qc.ca/avis-resultat-recherche/consulter?ItemId=9ff9a13c-e1da-41e7-a536-eea9e420fdb7)
