# Celina Independent School District Ionwave #2026-055 Addendum 1

Celina Downtown Street Reconstruction and Infrastructure Improvements

**Posted:** October 30, 2026
**Respond By:** November 16, 2026
**Identifier:** 2026-055 Addendum 1
**NAICS:** 237310, 237990

The City of Celina is seeking a contractor for downtown street reconstruction and related infrastructure upgrades at Ohio Street and Louisiana Drive.
- **Government buyer:** City of Celina, Texas — Purchasing Manager; Collin County.
- **Scope:** Reconstruct two residential asphalt street blocks as 29-foot-wide concrete curb-and-gutter streets, including street and driveway paving, storm-drainage lines and detention, water and sewer work, private utility adjustments, and sidewalks.
- **Pricing and value:** Estimated project value is approximately $4.9 million. Bidders must price the entire project; partial-package bids will not be accepted. A $380,000 private sewer-work allowance is included and is not to be priced separately.
- **Notable requirements:** Expected construction duration is 360 calendar days. Prevailing wage rates for Collin County apply. Hand pours and vibratory truss screeds are permitted; slip-form paving is not required. The City pays for initial materials testing, while the contractor pays for retests after failed tests. The engineer coordinates TDLR inspection.
- **Bonds:** The attachment identifies performance, payment, and maintenance bonds at 100% of the contract price for the successful bidder. The latest notice does not state the earlier 5% bid-bond requirement.
- **OEMs and vendors:** No manufacturers, OEMs, or vendors are identified.

### Description

The City of Celina is soliciting bids to reconstruct two existing residential asphalt street blocks into 29-foot back-to-back concrete curb and gutter. Work includes street and driveway paving, storm drainage lines and detention, water and sewer work, private utility service adjustments, and sidewalks. Bidders must submit pricing for the entire project; partial-package bids are not accepted for selection. The anticipated total bid price is approximately $4.9 million, and the expected project duration is 360 calendar days.