# Douglas County Ionwave #CI-2026-0148

Omaha citywide sidewalk, ADA curb ramp, and related construction and repair

**Posted:** November 04, 2026
**Respond By:** December 02, 2026
**Identifier:** CI-2026-0148
**NAICS:** 237310, 238910, 238990

The City of Omaha is seeking contractors for citywide sidewalk, pavement, driveway, curb, and ADA ramp construction and repair through Omaha Public Works.
- **Buyer:** City of Omaha, Omaha Public Works; the Human Rights and Relations Department oversees Economic Sustainability Program requirements.
- **Scope:** Citywide removal, excavation, concrete construction and repair, curb ramps, detectable warning panels, retaining walls, utility adjustments, sod, sprinkler-head replacement, tree-root trimming, and skid-loader rental. See the service line items for every bid-schedule item, quantity, and item number.
- **OEMs and vendors:** No manufacturers, OEMs, or vendors are named; the City is seeking qualified contractors.
- **Notable requirements:** Detectable warning panels must be natural unfinished cast iron. Contractors must commit at least one crew for the contract duration. For projects exceeding $650,000, an annual Economic Sustainability Program plan addresses Small and Emerging Small Business participation, workforce development in targeted areas, and youth engagement, with quarterly updates. Apprentice utilization is optional; the stated incentive requires at least 10% of project labor hours to be performed by apprentices.

### Description

The City of Omaha is soliciting bids for sidewalk construction and repairs and miscellaneous ADA curb ramp construction at various locations citywide. Work includes removing existing curb, sidewalks, pavement, and driveways; grading and forming; and constructing curb and gutter, curb ramps, sidewalks, driveways, pavement, and walls, including truncated domes. The solicitation describes an indefinite-delivery/indefinite-quantity multiple-award contract, with selected contractors required to commit at least one crew for the contract duration. An Economic Sustainability Plan is required; apprentice utilization is optional, and the project has no SEB reserve.

[View original listing](https://douglascountypurchasing.ionwave.net/PublicDetail.aspx?bidID=1306&SourceType=1)
