# Carrollton Ionwave #ENG CSP #27-011 Addendum 1

Frankford Road Segment 3 Reconstruction

**Posted:** October 26, 2026
**Respond By:** December 02, 2026
**Identifier:** ENG CSP #27-011 Addendum 1
**NAICS:** 237310, 238210, 237990

The City of Carrollton is seeking a contractor to reconstruct Frankford Road, Segment 3, between Old Denton Road and Standridge Drive.
- **Buyer:** City of Carrollton, Purchasing Department; procurement contact listed as Priscilla Ann Gonzalez.
- **Project:** Roadway and right-of-way reconstruction, estimated at **$12,260,900**, with an anticipated start in 2027. The contractor proposes the contract duration; no completion date is specified.
- **Scope and quantities:** Extensive demolition and earthwork; approximately 28,300 SY of reinforced roadway concrete pavement, 3,150 SY of driveway pavement, 3,300 SY of sidewalk, and 30,050 SY of geogrid; storm sewer, water main and valves, fire hydrants, lighting, traffic signals and markings, erosion control, landscaping, and irrigation. The full bid schedule is listed below.
- **OEMs and named organizations:** **Tensar** is named for the NX750 geogrid specification, which permits an equivalent. **Oncor** is identified as providing 58 LED luminaires and 29 galvanized poles. Other named organizations in the materials include ATMOS, DART, Spectrum, and IonWave; they are referenced in project or procurement materials, not identified as construction bidders or product manufacturers.
- **Notable requirements:** A TDLR inspection is required. Paving generally requires a paving machine, with hand placement allowed for driveways and intersections. The City pays for the initial construction materials test; the contractor is responsible for failed-test costs and construction water. Bid evaluation weights price at 60%, contractor qualifications and project history at 25%, and proposed construction duration at 15%.

### Description

The City of Carrollton is seeking proposals for the Frankford Road Reconstruction Seg 3 project. The listed attachments include a bid manual, plans, ATMOS pothole locations, DART specifications, and geotechnical data; the bid manual identifies the project limits as Old Denton Road to Standridge Drive. Bidders must submit a bid bond on the City form and/or cashier’s check equal to 5% of the total bid. The estimated project cost is $12,260,900, and the anticipated project start is February 2027.

[View original listing](https://carrolltonbids.ionwave.net/PublicDetail.aspx?bidID=502&SourceType=1)
