# City of Fayetteville Ionwave #Bid 26-56 Addendum 3

Fayetteville–Drake Field Airport Phase 2 Hangar Infrastructure Improvements

**Posted:** October 11, 2026
**Respond By:** November 03, 2026
**Identifier:** Bid 26-56 Addendum 3
**NAICS:** 237110, 237990

The City of Fayetteville is soliciting bids for Phase 2 civil infrastructure work at Fayetteville–Drake Field Airport.
- **Buyer:** City of Fayetteville, Arkansas; project at Fayetteville–Drake Field Airport.
- **Work requested:** Construction of hangar infrastructure adjacent to the existing East General Aviation Apron, including an 8-inch water line extension with associated appurtenances and grading.
- **Contractors:** Properly licensed contractors are sought. No OEMs, product brands, or vendors are identified.
- **Products and quantities:** No separately specified products, part numbers, or quantities; the water line is specified by diameter only.

### Description

The City of Fayetteville is seeking sealed bids from properly licensed contractors for construction of Hangar Infrastructure Improvements (Phase 2) at Fayetteville–Drake Field Airport. Work includes an 8-inch water line extension with associated appurtenances and hangar grading adjacent to the existing East General Aviation Apron. The bid opening is scheduled for November 3, 2026, at 2:00 PM CT, with a public opening at Fayetteville City Hall and a livestream via Zoom.

[View original listing](https://fayetteville-ar.ionwave.net/PublicDetail.aspx?bidID=857&SourceType=1)
