# Nevada Ionwave #27300240

Carson City trailhead parking, restroom, shade structure, and site improvements

**Posted:** November 03, 2026
**Respond By:** December 03, 2026
**Identifier:** 27300240
**NAICS:** 237310, 237990

Carson City is seeking a contractor for improvements to the Carson River Trail System Phase IV Riverview Trailhead.
- **Buyer:** Carson City, Nevada; the award-information attachment identifies the Contracts and Purchasing Administrator.
- **Project:** Carson River Trail System Phase IV Riverview Trailhead horizontal construction (Solicitation 27300240; Project G504725002; CC-2027-069).
- **Work requested:** Remove the existing parking area while protecting memorial monuments; construct an upgraded parking area; install a prefabricated restroom and shade structure; build concrete picnic areas and walkways; revegetate disturbed areas; and connect the site to existing trails. Existing utilities will be used.
- **Key requirements:** Prepare and implement a stormwater pollution prevention plan (SWPPP). Nevada prevailing wages apply, including applicable Davis-Bacon wage determinations. The project is federally funded through the Southern Nevada Public Land Management Act.
- **Estimated project cost:** Engineer’s estimate is $1,370,409.
- **OEMs and vendors:** **3M Company** is named among portal invitees but is not associated with a specified product. Other named portal invitees are ¡Gilpin Transitport; 1 Sun Solar Electric, LLC; 1st Electric and Automation.; 1-Vision; 2 Queens LLC; 2 Stacks LLC; 295 Cabling; 2H Construction Inc; 2ND RODEO CONSTRUCTION; 3B Resources Inc.; 3D Fitness Soldier LLC; 3G Productions; 4 Elements Distribution Group; and 4 K Construction inc. These entities are invitees, not identified awardees.
- **Period of performance:** Work starts after the Notice to Proceed and must be completed within the working-day period specified in the Special Conditions; the duration is not provided in the available information.

### Description

Carson City seeks sealed electronic bids for Phase IV of the Carson River Trail System at the Riverview Trailhead. Work includes demolishing and removing the existing parking area while protecting memorial monuments, constructing an upgraded parking area, installing a prefabricated restroom and shade structure, and building concrete picnic areas and walkways. The scope also includes revegetating disturbed areas, connecting to existing walking trails, using existing utilities, and preparing and executing a SWPPP. The corrected engineer’s estimate is $1,370,409, and the project is federally funded.

[View original listing](https://nevada.ionwave.net/PublicDetail.aspx?bidID=20798&SourceType=1)