# SAM #140RR027B0004

Construction of NGWSP Cutter Lateral Reach 21 Booster Plant and Regulating Tank Improvements

**Buyer:** Upper Colorado Regional Office
**Posted:** November 02, 2026
**Respond By:** January 25, 2027
**Identifier:** 140RR027B0004
**NAICS:** 237110, 237990, 236210

The Bureau of Reclamation is seeking a construction contractor for the NGWSP Cutter Lateral Reach 21 Booster Plant and improvements at Regulating Tank No. 3 in San Juan County, New Mexico.
- **Government buyer:** U.S. Department of the Interior, Bureau of Reclamation, Upper Colorado Region, Regional Office; Contracting Officer Tyler Spencer.
- **Scope:** Build a prefabricated concrete booster pump station and foundation, install associated pumps and piping, and construct a new welded-steel regulation tank with related site, electrical, communications, and restoration work.
- **Major equipment and quantities:** Two vertical in-line pumps (one standby); one 500,000-gallon Tank B (45 ft diameter by 48 ft high); two tank mixers; 24 magnesium anodes; one 10-W, 6-V solar panel; and contractor-supplied radio equipment, including T3ANT02/T3RAD02, T3ANT03/T3RAD03, and replacement UPS/enclosure LCP 900-02. Tank drawing part number: T-900-100-02.
- **Construction quantities:** Schedule A includes 680 yd² clearing and grubbing, 460 yd³ common excavation, 870 yd³ compacted backfill, and 135 linear ft of chain-link fence. Schedule B includes 3,600 yd² clearing and grubbing, 3,082 yd³ common excavation, 5,590 yd³ compacted backfill, and 510 linear ft of chain-link fence, plus other listed earthwork, erosion-control, and surfacing items.
- **Named OEM/product brand:** **UltraMag**, identified for high-potential magnesium anodes. No other OEMs or contractor vendors are named; no other equipment part numbers are specified.
- **Notable requirements:** Potable-water-compatible components; licensed 11-GHz radio links; 120-psig piping leak tests; commissioning and reliability testing; full-time safety and quality-control representatives; qualified survey support; as-built drawings and O&M manuals; and Indian employment and subcontracting preference. The notice also identifies an SBA set-aside.
- **Performance:** Begin within 21 calendar days after notice to proceed and complete within 393 calendar days; no option years are specified.
- **Estimated project magnitude:** $10–25 million.

### Description

EO 14398 NGWSP Cutter Lateral Reach 21 Booster Plant

[View original listing](https://sam.gov/opp/d20f39b306754b988e0b0b9e2983aad9/view)
