# South Carolina Business Opportunities #65746

MUSC UPS #1 and Associated Mechanical Equipment Replacement

**Posted:** May 12, 2026
**Respond By:** May 27, 2026
**Identifier:** 65746
**NAICS:** 236220, 238210, 238220

MUSC is seeking design-bid-build construction to replace the Psychiatric Institute Data Center’s UPS #1 and related mechanical equipment.
- **Government buyer:** Medical University of South Carolina (MUSC), Engineering & Facilities; Charleston, South Carolina.
- **Scope:** Replace the existing UPS #1 system and associated mechanical equipment on the sixth floor of the IOP Center at the MUSC Psychiatric Institute Data Center.
- **Estimated construction cost:** $3.6 million–$3.8 million.
- **OEMs and vendors:** No UPS manufacturer or product brand is identified. GWA Electrical Engineers, Inc. is named as the A/E firm; no equipment supplier is specified.
- **Products:** UPS #1 system and associated mechanical equipment; no model numbers, part numbers, or equipment quantities are provided.
- **Services:** One design-bid-build construction effort for the replacement project.
- **Notable requirement:** The work is a replacement project at an operating institutional data center; the solicitation does not specify the UPS technology or manufacturer.

### Description

The project is for replacement of the existing UPS #1 system and associated mechanical equipment on the sixth floor of the IOP Center at the Medical University of South Carolina in Charleston, South Carolina. The work is being procured as design-bid-build construction services. This is a re-advertisement with a change in bid date, and bids are due May 27, 2026, at 10:00 a.m. The stated construction cost range is $3,600,000 to $3,800,000.

[View original listing](https://scbo.sc.gov/online-edition?s=65746)