# South Carolina Business Opportunities #65559

CCEHBR Building asbestos abatement, demolition, and removal

**Posted:** May 05, 2026
**Respond By:** June 11, 2026
**Identifier:** 65559
**NAICS:** 562910, 238910

South Carolina DNR is seeking construction services to abate asbestos and demolish and remove the CCEHBR Building in Charleston.
- **Government buyer:** South Carolina Department of Natural Resources (DNR); project location is the Marine Resources Research Center in Charleston, South Carolina.
- **Requested services:** Design-bid-build construction services for asbestos-containing materials (ACM) abatement, demolition, and removal of the CCEHBR Building.
- **Estimated construction cost:** $900,000–$1,000,000.
- **Named firm:** Alvero Studios LLC is identified as the architect/engineer firm. No product OEMs or equipment vendors are specified.
- **Notable requirements:** The work includes ACM abatement before building demolition and removal.

### Description

The project is for asbestos-containing materials (ACM) abatement, demolition, and removal of the CCEHBR Building. Work is located at the Marine Resources Research Center and will use the Design-Bid-Build delivery method. The bid submission deadline is June 11, 2026, at 2:00 p.m.; one copy is required. The stated construction cost range is $900,000 to $1,000,000.

[View original listing](https://scbo.sc.gov/online-edition?s=65559)
