# Hermosa Beach Planet bids #BID 26-005

Hermosa Beach CIP 106 Annual Street Paving, Accessibility, and Traffic-Safety Improvements

**Posted:** October 30, 2026
**Respond By:** December 09, 2026
**Identifier:** BID 26-005
**NAICS:** 237310, 237990

The City of Hermosa Beach Public Works Department is seeking construction services for its CIP 106 Annual Street Improvements Project across multiple city streets.
- **Buyer:** City of Hermosa Beach, Public Works Department, Los Angeles County, California.
- **Scope:** Street paving and rehabilitation, concrete and ADA-accessibility work, utility adjustments, traffic markings and detection, and pedestrian-safety improvements.
- **Named OEMs and vendors:** **Carmanah** (R920-E solar rectangular rapid flashing beacon), **Polara** (IDX APS push button), **Trafficalm** (M75-BCNPT-SBA1 solar flashing beacon), **Safety Step** (detectable warning surfaces and color-change kits), and **Ennis Flint (PPG)** (green thermoplastic bike marking). Approved equivalents are allowed where specified.
- **Major quantities:** 460,000 SF of 2-inch cold milling; 6,500 tons of ARHM-GG-C overlay; 550 tons of C2-PG 64-10 asphalt overlay; 58 ADA curb ramps; 3,700 SF of sidewalk; 30 Type E and 11 Type D inductive loop detectors; 4 rectangular rapid flashing beacons; and 1 Trafficalm solar flashing beacon.
- **Other work:** Pavement and concrete reconstruction, utility structure adjustments, detectable warning surfaces, pedestrian push-button posts, traffic control, surveying, signage and striping, and potential unsuitable-material excavation and replacement.
- **Notable requirements:** Complete the work within 75 working days after the Notice to Proceed; begin within 10 working days of the Notice to Proceed. Work includes weekday work hours of 8:00 a.m. to 6:00 p.m., city permits, traffic control, and compliance with Caltrans direction for work on Pacific Coast Highway.
- **Engineer’s estimate:** $3,500,000.

### Description

The project includes cold milling and asphalt rubber hot mix overlay with selected full-depth pavement repairs, along with traffic striping and traffic loops. Work also includes removal and reconstruction of curb ramps, sidewalks, curbs, and curb and gutter, plus installation of rectangular rapid flashing beacons, single flashing beacons, and pedestrian push buttons. Related work is included, and the stated project duration is 75 working days. Attendance at the November 18, 2026 pre-bid conference is mandatory; bids will not be accepted from bidders who do not attend.

[View original listing](https://vendors.planetbids.com/portal/51313/bo/bo-detail/147813)
