# La Canada Flintridge Planet bids #147815

Cornishon Corridor feasibility study and phased implementation planning

**Posted:** October 29, 2026
**Respond By:** January 08, 2027
**Identifier:** 147815
**NAICS:** 541320, 541310, 925120

The City of La Cañada Flintridge is seeking a lead consultant to study the feasibility and phased planning of the Cornishon Corridor.
- **Government buyer:** City of La Cañada Flintridge City Manager’s Office, coordinating with the La Cañada Unified School District; the identified contact is Assistant City Manager Arabo Parseghian.
- **Scope:** Assess the corridor as an integrated civic, educational, recreational, cultural, and potentially commercial or mixed-use district. The study considers District offices and adjoining property, Lanterman Auditorium, pickleball and tennis courts, the City Community Center, FIS upper and lower fields, and the Cornishon baseball field.
- **Phase One:** Required feasibility and business-case work includes review of facilities and records; property, legal, land-use, site, and access analysis; rental-income replacement and financial feasibility; comparison of at least two commercial or mixed-use scenarios with continued current use; comparable-project research; and an integrated report, financial workbook, and decision presentation. Legal analysis must involve a qualified California attorney.
- **Options:** Separately priced options cover consultant-led community engagement; Phase Two concept exploration and a second community engagement round; consultant-produced concepts if academic participation is unavailable or insufficient; and Phase Three schematic design and implementation planning. Optional phases are not guaranteed.
- **Notable requirements and limits:** The lead consultant is responsible for coordination, quality, schedule, and continuity across authorized work. The scope includes planning and analysis only; it does not authorize redevelopment, a land transaction, financing, or construction. Additional design, permitting, studies, procurement support, and construction-phase services require separate pricing and authorization.
- **OEMs and vendors:** No product manufacturers, OEMs, or consulting providers are named in the solicitation. No physical products or part numbers are requested.

### Description

The City of La Cañada Flintridge, in coordination with the La Cañada Unified School District, seeks proposals for professional consulting services for a feasibility study and phased implementation services for the Cornishon Corridor. The study will evaluate the area as an integrated civic, educational, recreational, cultural, and community-serving district. The initial award covers Phase One core services and any selected Phase One engagement option; firms must also price Phase Two and Phase Three as options, which are not guaranteed. The lead consultant will be responsible for coordination, quality, schedule, and continuity across authorized phases.

[View original listing](https://vendors.planetbids.com/portal/62508/bo/bo-detail/147815)
