# City of Lincoln Ionwave #26-203 Addendum 2

Pinnacle Bank Arena carpet and wall-base replacement

**Posted:** October 21, 2026
**Respond By:** November 04, 2026
**Identifier:** 26-203 Addendum 2
**NAICS:** 238330

The City of Lincoln is seeking an all-or-nothing bid to replace carpet and wall base in ten designated areas of Pinnacle Bank Arena.
- **Government buyer:** City of Lincoln, Purchasing Division. A separate insurance attachment identifies the West Haymarket Joint Public Agency as the owner for insurance requirements.
- **Specified OEMs and brands:** **Interface** (Exposed and SR999 Step Retreat), **Echo Collection** (Harmonic), **J+J Flooring** (Obsidian), and **Johnsonite** (DC-40 wall base).
- **Products and areas:** Interface Exposed carpet is specified for the Officials Lounge, Visiting Team Locker Room, Character Locker Room, and Dedication and Courage Locker Room. Interface SR999 Step Retreat walk-off carpet is specified for the Security Entry, South Vestibule, North Vestibule, and Main Concourse Capital Terrace. Echo Collection Harmonic is specified for the Parking Garage Entry Event Level, and J+J Flooring Obsidian for the Club Lounge. Johnsonite DC-40, 4½-inch coved wall base, is specified across the areas in black, grey, or light grey.
- **Quantities and pricing structure:** Ten area-specific lump-sum bid lines, one per area. Material square footage is not stated. Provide attic stock of two boxes of each carpet color and one box of resilient base per color for each area.
- **Work and notable requirements:** Remove existing carpet and wall base where specified, install the specified products, and include labor, supervision, materials, equipment, supplies, permits, and licenses. Provide a dumpster and dispose of removed materials. Coordinate work phasing, delivery, access, and onsite storage with the arena contact and event schedule. The floor is concrete with existing carpet; light scraping and additional adhesive may be needed for carpet-tile replacement. No moisture concern or contractor equipment moving requirement was reported.
- **Insurance requirements:** The insurance attachment calls for commercial general liability coverage of at least $1 million per occurrence and $2 million aggregate, auto liability of at least $1 million per accident, and workers’ compensation as required by law with employers’ liability of at least $500,000. It also specifies additional-insured status and waivers of subrogation for the owner.

### Description

The City of Lincoln is seeking bids for removal of existing carpet and wall base and installation of new carpet and wall base at specified areas of Pinnacle Bank Arena. The scope includes four locker rooms, vestibules, the Club Lounge, the Premium Garage Entry, the Premium Entryway, the Security Entry, and the Officials Lounge, with labor, materials, equipment, and related costs included. This is an all-or-nothing bid, and performance and payment bonds, each for 100% of the contract amount, are required. A mandatory pre-bid meeting and site visit was scheduled for October 27, 2026; installation must be completed by May 30, 2027.

[View original listing](https://col.ionwave.net/PublicDetail.aspx?bidID=17770&SourceType=1)
