# Greenville County Opengov #IFB #27033

Construction of Two Concrete Pads for Greenville County Sheriff’s Office Target System

**Posted:** October 30, 2026
**Respond By:** November 20, 2026
**Identifier:** IFB #27033
**NAICS:** 238110

Greenville County is seeking a contractor to build two concrete pads for the Sheriff’s Office target system in Taylors, South Carolina.
- **Government buyer:** Greenville County, South Carolina; Greenville County Sheriff’s Office; Procurement Services Division. The procurement contact identified is Katherine Hawthorne, Senior Buyer.
- **Work requested:** Construct one approximately 220 ft. × 20 ft. pad and one approximately 150 ft. × 8 ft. pad at the Sheriff’s Office Center for Advanced Training. The contractor supplies labor, materials, equipment, and supervision.
- **Key construction requirements:** Prepare, grade, and form the sites; install 5-inch-thick fiber-reinforced concrete rated at a minimum of 3,500 PSI at 28 days; provide a broom finish and saw-cut control joints; grade for drainage; remove debris and clean the work area.
- **Pricing and warranty:** Pricing is requested as separate lump sums for materials, labor, and applicable sales tax. Workmanship and materials carry a one-year warranty from final acceptance.
- **Schedule:** Complete the work within 30 days after the Notice to Proceed. The agreement attachment also contains a general 90-day completion provision; the specific concrete-pad solicitation states the 30-day requirement.
- **Named OEMs and product vendors:** None identified. No branded products or part numbers are specified.

### Description

Greenville County is seeking sealed bids from a qualified contractor to construct two concrete pads for a new target system at the Sheriff’s Office Center for Advanced Training in Taylors, South Carolina. Work includes preparing, grading, and forming the areas; installing approximately 220 ft. × 20 ft. and 150 ft. × 8 ft. pads using 5-inch-thick, fiber-reinforced concrete with a minimum compressive strength of 3,500 PSI at 28 days; and finishing, adding control joints, ensuring drainage, and cleaning the site. The contractor must provide all labor, materials, equipment, and supervision, hold the required South Carolina contractor’s license, and provide a 5% bid bond. Bids are due November 20, 2026, at 3:00 p.m.; attendance at the November 10, 2026 mandatory pre-bid meeting is required.

[View original listing](https://procurement.opengov.com/portal/greenvillecounty/projects/320071)