# North Texas Tollway Authority Marketplace #B2600001098

NTTA tollway drainage improvements and budgeting-tool procurement

**Posted:** October 30, 2026
**Respond By:** November 19, 2026
**Identifier:** B2600001098
**NAICS:** 237990, 237310

The North Texas Tollway Authority materials describe drainage and erosion-control construction on two tollways, along with a budgeting-tool requirement in an attached RFP.
- **Government buyer:** North Texas Tollway Authority (NTTA), including Procurement Services and Project Delivery—Construction & Operations; the attached budgeting-tool RFP identifies the Procurement Department and NTTA Finance team.
- **Work requested:** Improve drainage on the Sam Rayburn Tollway (SRT) and President George Bush Turnpike (PGBT) in Collin and Denton Counties. Tasks include ditch regrading and reshaping, drainage upgrades, erosion mitigation and armoring, and related infrastructure work.
- **Construction pay items:** The schedule lists 28 items covering right-of-way preparation, concrete and riprap removal, roadway excavation, embankment, blading, compost, sod, watering, irrigation and landscape work, concrete riprap, inlet adjustment and cleaning, traffic handling, temporary erosion controls, pavers, underdrains, tied-concrete block erosion-control mat, and subsurface utility locating. Quantities and listed item codes are provided below.
- **Additional attached requirement:** An NTTA Finance RFP (B190000151) seeks a dynamic budgeting tool with stronger reporting capabilities. No quantity, part number, software manufacturer, or vendor is identified.
- **Notable requirements:** The drainage work is to be completed within 120 calendar days from Notice to Proceed/time-charge commencement, with a 2-year warranty after final acceptance. The solicitation states a 20% small-business subcontracting goal. Bidders must meet prequalification requirements.
- **OEMs and vendors:** No commercial OEMs, manufacturers, or prospective vendors are named. NTTA is the government buyer, not a vendor.

### Description

The North Texas Tollway Authority is seeking bids for drainage improvements on the Sam Rayburn Tollway (SRT) and President George Bush Turnpike (PGBT). Work includes regrading and reshaping ditches, drainage system upgrades, erosion control measures, and related drainage infrastructure improvements. The RFB specifies a four-month contract term and lists an estimated project value of $1,000,000 to $5,000,000. A small business goal of 20% is stated in the solicitation documents.

[View original listing](https://www.nttamarketplace.org/bso/external/bidDetail.sda?docId=B2600001098&external=true&parentUrl=close)
