# SAM #697DCK-27-R-FLL01

FAA market survey for progressive design-build of a replacement Fort Lauderdale airport ATCT

**Buyer:** FAA Regional Acquisition Services
**Posted:** October 29, 2026
**Respond By:** November 05, 2026
**Identifier:** 697DCK-27-R-FLL01
**NAICS:** 236220, 237990, 237310, 237130, 541330

The FAA is seeking market input and a qualified progressive design-build team for a replacement air traffic control tower at Fort Lauderdale-Hollywood International Airport.
- **Government buyer:** Federal Aviation Administration (FAA), Terminal Facilities Program, Construction Contracting; contact listed as ThuyLinh TranNguyen.
- **Opportunity:** Progressive design-build of a new Airport Traffic Control Tower (ATCT) and adjacent administrative base building, including design, construction, utilities, site work, and commissioning coordination.
- **OEMs and vendors:** No OEMs, product manufacturers, or contractor vendors are named. The FAA will independently supply, install, and maintain the National Airspace System (NAS) electronic equipment; a third-party commissioning agent will be hired by the FAA.
- **Services and line items:** Phase 1 validation, preliminary design, and preconstruction; optional Phase 2 final design and tower construction; optional site, parking, and existing-tower demolition work; and discretionary early-work and long-lead-item procurement. No product part numbers or product quantities are specified.
- **Notable requirements:** Preliminary design is expected to reach approximately 60–70%. Scope includes permitting, FAA standards, wind-tunnel testing, BIM, utilities, security and access control, and coordination with FAA equipment and independent service providers.
- **Estimated value:** The combined Phase 1–2 target budget is approximately $85 million. The market survey is for procurement planning and is not itself a solicitation.

### Description

<p>This is the Market Survey for the Progressive Design Build (PDB) of the new Fort Lauderdale-Hollywood International Airport (FLL) Air Traffic Control Tower (ATCT) in Fort Lauderdale, FL.</p>

<p>The Federal Aviation Administration (FAA) has a potential upcoming project for the design and construction of a new Airport Traffic Control Tower (ATCT) at the Fort Lauderdale-Hollywood International Airport (FLL) in Fort Lauderdale, FL. The purpose of this Market Survey is to seek interested and qualified sources capable of completing this requirement and to gather critical industry feedback regarding alternative project delivery and contracting strategies. This market survey is being conducted in accordance with FAA Acquisition Management System (AMS) Policy Section 3.2.1.2.1 (Market Analysis) to assist in procurement planning and acquisition strategy development. See attach notice for full details.&nbsp;</p>

[View original listing](https://sam.gov/opp/6657189b47624c8d94f88b6f8a960a45/view)
