# Cedar Rapids Ionwave #3012544-03 Addendum 1

Kirkwood Boulevard SW roadway, trail, drainage, and pedestrian beacon rehabilitation

**Posted:** October 21, 2026
**Respond By:** November 04, 2026
**Identifier:** 3012544-03 Addendum 1
**NAICS:** 237310, 237990

The City of Cedar Rapids is seeking unit-price bids to rehabilitate Kirkwood Boulevard SW between Rolling Ridge Drive and 66th Avenue.
- **Buyer:** City of Cedar Rapids, Public Works Department, Engineering office, Cedar Rapids, Iowa.
- **Scope:** Roadway pavement rehabilitation and patching, shared-use path and sidewalk work, storm sewer and intake improvements, curb ramps and detectable warnings, pavement markings, traffic control, signage, pedestrian hybrid beacon installation, and site restoration and erosion control.
- **Estimated value:** The engineer’s probable cost is $1,380,000.
- **Schedule and duration:** The work is to start upon Notice to Proceed and be completed within 80 working days. A four-year maintenance period is specified. The Phase 2A closure of the Rolling Ridge Drive/Kirkwood Boulevard intersection cannot begin before the project’s stated milestone date.
- **Notable requirements:** Contractor must provide staged traffic control and pedestrian detours, maintain 24/7 driveway access to the Kirkwood Water Tower, and coordinate traffic-signal and fiber work with the City and its fiber vendor. Fiber splicing is by others, and the City and vendor must receive advance notice before fiber installation and connection work.
- **OEMs and named firms:** No product OEMs or manufacturers are identified. Snyder & Associates, Inc. is named as the design engineer, not as an OEM or product supplier. The City’s fiber vendor is not named.
- **Bid schedule:** The 58 unit-price line items, including quantities and bid-item numbers, are listed below under services. The plans also call out traffic-signal equipment, including specified pole and luminaire models, without stating order quantities.

### Description

The City of Cedar Rapids is requesting unit-price bids for rehabilitation work on Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue. The work generally includes pavement rehabilitation and patching, trail repair, a pedestrian hybrid beacon, storm intakes and storm sewer, and curb ramps. The Engineer’s opinion of probable cost is $1,380,000, and final completion is required within 80 working days. Bids are due November 4, 2026, at 11:00 a.m. CT; the listed milestone work cannot start before June 14, 2027.

[View original listing](https://citycrbids.ionwave.net/PublicDetail.aspx?bidID=1962&SourceType=1)