# Federal Register #2026-22021

OSHA Compressed-Air Work Variance for the Cemetery Brook Drain Tunnel Project

**Buyer:** Occupational Safety and Health Administration (OSHA), Department of Labor
**Posted:** October 29, 2026
**Identifier:** 2026-22021

A U.S. Department of Labor OSHA notice sets project-specific compressed-air safety rules for the Cemetery Brook Drain Tunnel Project; it is not a solicitation for products or services.
- Government agency: U.S. Department of Labor, Occupational Safety and Health Administration (OSHA).
- Named project entity: Obayashi-Jay Dee Joint Venture.
- Regulatory action:
  - Grants the joint venture a permanent variance from specified OSHA compressed-air requirements, allowing use of the 1992 French Decompression Tables and alternative decompression controls and chamber arrangements.
  - Compressed-air exposure is capped at 37 p.s.i.g.
  - Conditions include a project-specific hyperbaric operations manual, compliant chambers, worker training and communication procedures, equipment inspections, hazard controls, recordkeeping, and notifications.
  - The variance applies only to this project and remains effective until project completion or OSHA modifies or revokes it.
- The document also includes a separate OSHA request for comments concerning continued approval of information-collection requirements for the Fire Protection in Shipyard Employment Standard; this is not a request for products or services.
- No products, part numbers, or purchase quantities are specified.

### Description

OSHA grants Obayashi-Jay Dee Joint Venture a permanent variance related to work in compressed-air environments for the Cemetery Brook Drain Tunnel Project. The variance permits alternative measures for applicable OSHA compressed-air standards, subject to conditions specified in the notice. It remains in effect until the project is completed or OSHA modifies or revokes it.

[View original listing](https://www.federalregister.gov/documents/2026/10/29/2026-22021/obayashi-jay-dee-joint-venture-cemetery-brook-drain-tunnel-project-grant-of-permanent-variance)
