The City of Bryan is seeking a firm-fixed-price proposal to construct a cemetery sales office and maintenance facility in Bryan, Texas.
- **Government buyer:** City of Bryan; documents identify the Purchasing Department, Special Projects Department, and Public Works Department. The project is at Bryan City Cemetery, 1711 Cavitt Avenue.
- **Scope and value:** Complete building and site construction, including civil, structural, architectural, mechanical, electrical, and plumbing work. The attachment summary estimates a $300,000 budget.
- **Named OEMs and vendors:** **Carrier, Sterling, Greenheck, Rheem, Bell & Gossett, Watts, American Standard, Chicago Faucet Company, Elkay, Kohler, Guy Gray, MIFAB, Powers, Sensus, Woodford, Knox, Cisco, GAF, MBCI, and James Hardie** (Hardie Panel siding). Several of these are specified in building schedules; no separate reseller is identified.
- **Key scheduled products:** Carrier fan coil/condensing unit (FT5ANXC48L00 / 27TPA848A003, quantity 1); Sterling gas unit heater (GG-45, quantity 1); Greenheck exhaust fans (SP-B110ES, SP-A200, and SE1-12-432-VG, one each); Rheem tankless gas water heater (RTG-95XLN-3, quantity 1); and Bell & Gossett circulating pump (quantity 1).
- **Other scheduled products:** Two American Standard water closets (2857.128) and two lavatories (0321.075); Elkay sinks (B1C18X18X and LRAD252265, one each); Guy Gray ice maker box (88531, quantity 1); MIFAB floor drains (F1100-C-S-1, quantity 3 in the construction plans; another attachment lists 2) and floor sink (FS1930-FL-F4-7-150, quantity 1); Powers mixing valves (LFG480, quantity 2); Watts backflow preventer (LF009-QT, quantity 1); and Sensus gas regulator (61R2, quantity 1).
- **Additional specified items:** Four Woodford wall hydrants (B65-CH); one recessed Knox emergency key box; one Cisco wireless access point (AIR-AP1142N-A-K9); base-bid GAF Royal Sovereign or equal asphalt roofing and an MBCI LokSeam or equal standing-seam metal roofing alternate; and engineered metal-plate-connected wood roof trusses. Hardie Panel fiber-cement siding is also specified. Faucet and plumbing accessory details are listed in the product descriptions below.
- **Notable requirements:** The documents describe construction rather than demolition and reconstruction, with demolition references and areas revised or removed. The contractor must provide accessibility-compliant work, required bonds and insurance, and contractor registration. Plans call for mechanical condensate to discharge to the sanitary sewer, applicable electrical-code compliance, and engineered trusses submitted as a deferred design. Landscaping is identified as owner-performed.
- **Pricing and schedule:** Submit one firm-fixed lump-sum price for the complete scope. The project is to be completed within 270 calendar days after the City's written Notice to Proceed; proposers must also state proposed durations to substantial and final completion.

### Description

The City of Bryan is requesting proposals for construction of its cemetery maintenance shop and sales office. The procurement materials include construction documents, technical specifications, drawings, a sample contract, and insurance requirements. Proposers must submit one firm fixed lump-sum price for the complete project scope and provide a construction duration. Proposals are due November 10, 2026, at 2:00 PM CST, and may be submitted electronically or sealed.