# Georgia Procurement Registry #PE-75553-NONST-2027-000000066

Dalton Utilities DC/UPS System for the J.D. Cope Energy Facility

**Posted:** October 28, 2026
**Respond By:** November 11, 2026
**Identifier:** PE-75553-NONST-2027-000000066
**NAICS:** 335911, 335999

Dalton Utilities is soliciting bids for a complete DC/UPS system for the J.D. Cope Energy Facility in Dalton, Georgia.
- **Buyer and facility**
  - Buyer: Dalton Utilities; facility: J.D. Cope Energy Facility, Dalton, Georgia.
  - No equipment OEMs, manufacturers, or suppliers are named in the provided notice.
- **Requested equipment**
  - One 125 VDC station battery with racks and spill containment; one battery fused disconnect switch; and one station battery load-test non-fused disconnect switch. Both disconnect switches are 125 VDC nominal and rated for 250 VDC.
  - Two redundant paralleling battery chargers; one inverter with static transfer switch; one manual bypass switch; and one isolation transformer/voltage regulator.
  - One 125 VDC nominal, 250 VDC-rated DC switchboard; one battery monitoring system; and one battery lifting device.
  - Two 120 VAC-rated AC panelboards and two 125 VDC nominal, 250 VDC-rated DC panelboards.
- **Notable requirements and included services**
  - The battery monitoring system must meet NERC PRC-005-06. Equipment is to be designed for indoor installation and storage and must meet the technical specification and equipment datasheets.
  - Scope includes engineering, manufacture, testing, documentation, delivery, and specified manufacturer field services, plus required spare parts, special tools, lubricants, and consumables.
  - Delivery is specified as DDP to the designated delivery point.

### Description

Dalton Utilities requests bids from qualified manufacturers and suppliers to engineer, manufacture, test, document, and deliver a complete DC/UPS system for the J.D. Cope Energy Facility, including specified field services. The work includes a 125 VDC station battery and related disconnects, chargers, inverter, switches, transformer/voltage regulator, switchboard, battery monitoring system, and panelboards. Technical requirements are governed by Technical Specification 197347.5.5430, Rev. 0, including its equipment datasheets. Bids are to be submitted to dkeaton@dutil.com by November 11, 2026, at 5:00 PM ET.

[View original listing](https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-75553-NONST-2027-000000066&sourceSystemType=gpr20)