# New York State Contract Reporter #RFB-UC26-149C

Boiler retubing and heat-exchanger repairs at SUNY Ulster’s Vanderlyn Hall

**Posted:** October 08, 2026
**Respond By:** November 05, 2026
**Identifier:** RFB-UC26-149C
**NAICS:** 238220, 332410

Ulster County is seeking mechanical repairs to the boiler and heat exchanger at SUNY Ulster’s Vanderlyn Hall.
- **Government buyer:** Ulster County Department of General Services, with Ulster County Purchasing involved; work is for SUNY Ulster at Vanderlyn Hall in Stone Ridge, New York.
- **OEMs and specified manufacturers:** **Belimo** (G250B-N control valve and LVX24-MFT actuator), **NIBCO** (F-619 gate valves), **Thrush** (Model S10-60-4A heat-exchanger tube bundle), and **Hurst** (existing Boiler No. 3).
- **Products requested:**
  - 76 SA-178A steel boiler tubes, 2-inch diameter, 0.105-inch wall, 107-3/4 inches long.
  - 68 SA-178A steel boiler tubes, 2-inch diameter, 0.105-inch wall, 83-1/2 inches long.
  - 1 Thrush Model S10-60-4A replacement heat-exchanger tube bundle, including required gaskets, seals, and installation hardware; the existing shell remains.
  - 2 NIBCO F-619, Material No. NHAC00H, 4-inch gate valves, or approved equal.
  - 1 Belimo G250B-N, 2-inch control valve, or approved equal; and 1 Belimo LVX24-MFT 24-volt linear actuator, or approved equal.
- **Services:** Retube Hurst Boiler No. 3; replace the heat-exchanger tube bundle, valves, and controls; and test, start up, and return the equipment to service.
- **Notable requirements:** Boiler work includes removal of 144 existing tubes, tube-hole and tube-sheet preparation and inspection, and written findings from liquid-penetrant testing of the rear tube sheet. Tube-sheet crack repairs require prior written authorization and are not included in the base scope. Asbestos inspection, testing, and abatement are excluded and will be handled by others if needed. Work timing must be coordinated with SUNY Ulster and may depend on the availability of backup boilers.

### Description

Ulster County seeks a qualified contractor to retube Boiler No. 3 and replace the heat exchanger tube bundle, associated valves, and controls in Vanderlyn Hall at SUNY Ulster in Stone Ridge, New York. The work includes liquid penetrant examination of Boiler No. 3’s rear tube sheet for cracks, with written findings provided to SUNY Ulster; crack repairs are excluded from the base bid and require prior written authorization. The contract begins January 1, 2027 and continues until successful completion of the work and final acceptance by SUNY Ulster, with the repair start scheduled in coordination with SUNY Ulster. An asbestos survey will be performed by others, and asbestos inspection, testing, or abatement is not to be included in the bid price.