# Utah Public Procurement Place U3P #RA27-131

First Step House interior renovation, including flooring, painting, and optional bathroom work

**Posted:** October 27, 2026
**Respond By:** November 26, 2026
**Identifier:** RA27-131
**NAICS:** 238330, 238320, 238390, 238220

First Step House is seeking bids to renovate its occupied transitional-housing facility in Salt Lake City.
- **Buyer and posting:** First Step House is the project buyer. Utah Division of Purchasing is providing a courtesy posting and is not conducting the procurement.
- **Named OEMs:** **Sherwin-Williams** paint is specified for walls, trim, and ceilings; **Armstrong Flooring** Imperial Texture VCT, model 51830 Cottage Tan, is specified for several areas, including the upstairs bathroom.
- **Base-bid work:** Remove wallpaper and adhesive; repair, prime, and paint walls, trim, and ceilings; replace carpet and pad in designated upstairs and basement rooms; install VCT in specified hall, dining, kitchen, breakfast-nook, and laundry areas; bring the stair railing up to current code; install two upstairs living-room ceiling lights; remove a living-room mirror and repair the wall; refinish kitchen cabinets and the pony wall; and replace basement-bedroom paneling with finished drywall. Flooring quantities are not provided.
- **Separately priced bathroom work:** Remove the existing upstairs tub and shower and install one tub/shower combination, including plumbing, backer board, waterproofing, and tile surround. Install matching VCT flooring and replace one vanity countertop, reconnecting the sink and faucet.
- **Notable requirements:** Carpet must be residential broadloom in solution-dyed or stain-treated nylon (or approved equal), with specified performance criteria and at least a 10-year wear and stain warranty. Carpet pad must be 7/16-inch, 6–8 lb rebond with an attached moisture barrier; moisture-barrier pad is required in basement rooms. The cabinet and pony-wall finish must be darker than the existing finish, with at least three coats of satin water-based polyurethane or approved equal. The building remains occupied, work must comply with Davis-Bacon prevailing-wage and certified-payroll requirements, and the contractor must provide a two-year workmanship warranty.

### Description

First Step House is seeking bids for interior renovations at 422 N 800 W, Salt Lake City, Utah. Base bid work includes wallpaper removal and painting, new carpet and VCT flooring, stair railing code compliance, installation of two ceiling lights, removal of a living room mirror, refinishing kitchen cabinets and a pony wall, and replacing basement bedroom paneling with drywall. A separate line item covers replacing the upstairs bathroom tub and shower with a tub/shower combination and replacing the vanity countertop. The building will remain occupied during construction, and Davis-Bacon prevailing wage requirements apply; attendance at the November 12, 2026 pre-bid meeting is mandatory.

[View original listing](https://utah.bonfirehub.com/opportunities/260286)
