# Garland Ionwave #REQ00002974 Addendum 3

Garland nine-alley reconstruction and wastewater improvements

**Posted:** September 28, 2026
**Respond By:** October 29, 2026
**Identifier:** REQ00002974 Addendum 3
**NAICS:** 237310, 237990, 238910, 237110, 238990

The City of Garland is seeking a construction contractor for a nine-alley reconstruction and wastewater improvement project in Garland, Texas.
- **Buyer:** City of Garland, Texas — Street Department and Procurement and Contract Administration; the bid documents also identify the Procurement and Contracts Division and City Purchasing Agent.
- **Project:** 2025 Alley & Wastewater Improvements Group 1 (REQ00002974; PWD2025006; Project No. 2025-026-168). Quiddity Engineering, LLC is identified as the civil engineer. The City intends to award the complete package to one contractor.
- **Scope:** Reconstruct nine alleys across Garland, including approximately 9,600 square yards of concrete alley pavement and about 5,706 linear feet of wastewater improvements. Work includes pavement and driveway replacement, sidewalks, sewer pipes and services, manholes, curbs, drainage, fencing, landscaping restoration, excavation, traffic management, erosion control, testing, and utility coordination.
- **Named manufacturers and specified products:** **Raven** epoxy lining is required for new manholes; bid items also specify Raven 405 lining. **Tensar** SQ2020, AmeriGrid BX2020, and TX120 are cited as examples of acceptable Type II geogrid, or approved equal.
- **Notable requirements:** New manholes require epoxy lining, which is incidental to the manhole bid items. Hard-rock excavation receives no extra compensation. The construction contingency is added by the City after bids close and is not priced by bidders.
- **Schedule and value:** Construction is estimated at 180 working days, with two years of maintenance after City acceptance. The targeted project budget is $4.5 million–$5 million. No option years or annual subscription are identified.

### Description

The City of Garland is soliciting bids for reconstruction of nine alleys and wastewater improvements in Garland, Texas. The alley work includes approximately 9,600 square yards of concrete alley pavement, with related sidewalk, sodding, fencing, retaining wall, and driveway work. Bidders must submit a 5% bid bond; performance, payment, and maintenance bonds are required upon award. The package will be awarded to a single bidder, and the contract duration is 180 working days.

[View original listing](https://garlandtx.ionwave.net/PublicDetail.aspx?bidID=4139&SourceType=1)