# Middletown Civic Plus #2026-015

Phased renovations and optional three-bay garage at Middletown Fire Station #2

**Posted:** October 27, 2026
**Respond By:** December 15, 2026
**Identifier:** 2026-015
**NAICS:** 236220, 238290, 238190, 238990

The City of Middletown is seeking bids for phased renovations at its operating Fire Station #2 on Cross Street, with separate alternates for sleeping quarters and a new garage.
- **Government buyer:** City of Middletown, Connecticut — Purchasing Department, for the Fire Department.
- **Base construction scope:** Temporary kitchen arrangements in Phases 1 and 1A, kitchen and dining renovations in Phase 2, and a new day room in Phase 3. Associated restroom, shower, architectural, mechanical, plumbing, and electrical work is included.
- **Alternates:** Alternate #1 renovates the east wing into permanent sleeping quarters, showers, janitor space, and an office. Alternate #2 builds a detached three-bay apparatus garage and includes catch-basin relocation, utility and sewer work, and associated site and building work. Separate lump-sum pricing is requested for the alternates.
- **Notable requirements:** The fire station must remain operational during construction, with emergency access maintained. Work must be phased and include temporary kitchen, dining, and day-room arrangements.
- **Named OEMs and manufacturers:** Panasonic, Broan, Zephyr (Tidal II), American Standard, Sloan, Josam, Symmons (Identity and Temptrol), Create GoodSinks, Elkay, InSinkErator, T&S, Oatey, PPP, JR Smith, Sure Seal, Lithonia Lighting, Brownlee Lighting, Lightolier, QTL Lighting, Dual-Lite, and Compass Lighting. The plans also specify manufacturer models for plumbing fixtures, ventilation, lighting, and emergency/exit lighting; approved equivalents are allowed for the Broan wall cap.
- **Notable specified products:** Panasonic exhaust fan FV-0511VF1; Zephyr/Tidal II hood AK7436AS, duct cover AK7026, and backsplash AK1716; American Standard fixtures including water closets 2257.101 and 5901.100, urinal 6590.001, and lavatories 3541.001US; and numerous scheduled windows, doors, plumbing components, luminaires, emergency lights, and exit signs listed below.
- **Commercial information:** Construction duration and contract period are not stated. No OEM products are specified for the construction services themselves.

### Description

The City of Middletown will rehabilitate approximately 5,000 square feet of the main-floor staff quarters at the Middletown fire station. Work covers phased renovations to the kitchen, day room, and bathroom areas, with an alternate for permanent sleeping quarters and another for a detached three-bay apparatus garage. The fire station will remain operational during construction, and emergency apparatus access must remain clear; temporary kitchen, dining, and day-room arrangements are included in the work sequence. Bids are due December 15, 2026, at 11:00 AM and must be submitted in duplicate with a 5% bid bond.