# Boca Raton Ionwave #2026-015-VG Addendum 1

Boca Raton potable and reclaimed water meter installation and replacement

**Posted:** October 20, 2026
**Respond By:** November 23, 2026
**Identifier:** 2026-015-VG Addendum 1
**NAICS:** 237110, 221310

The City of Boca Raton is seeking proposals for citywide potable and reclaimed water meter installation and replacement.
- **Government buyer:** City of Boca Raton, Florida; local government. The solicitation does not identify a specific department or office.
- **Requested work:** Install and/or replace potable and reclaimed water meters, and install City-furnished advanced metering infrastructure (AMI) transponders. Meter quantities and models are not specified.
- **Additional requirements:** Replace meter lids with City-approved lids that include an AMI lid option; GPS-locate each meter; determine the material composition of service lines 2 inches or smaller on both the City and customer sides; and maintain project records, including photos.
- **OEMs and vendors:** No manufacturers, OEMs, or contractor vendors are identified by name. The AMI transponders are furnished by the City.
- **Estimated budget:** $15 million.
- **Performance period:** Not specified.

### Description

The City of Boca Raton is seeking proposals to install and/or replace potable and reclaimed water meters with City-furnished AMI transponders throughout the city. The work includes replacing meter lids with City-approved lids that have an AMI lid option, GPS-locating each meter, and determining the composition of service lines 2 inches or less on both the City and customer sides. Required data documentation, including photos, must be maintained. The estimated budget is $15,000,000, and submissions are electronic according to the RFP instructions.

[View original listing](https://brpurch.ionwave.net/PublicDetail.aspx?bidID=3507&SourceType=1)
