# E-Rate #270002558

Lockland City School District network switches, accessories, APC UPS, and installation

**Posted:** October 23, 2026
**Respond By:** November 20, 2026
**Identifier:** 270002558
**NAICS:** 423430, 238210

Lockland City School District is seeking network switching equipment, accessories, an APC uninterruptible power supply, and installation/configuration services.
- **Buyer:** Lockland City School District, Cincinnati, Hamilton County, Ohio; sub-agency and purchasing office are not specified.
- **OEMs:** **Extreme Networks** (ExtremeSwitching) is the specified network equipment manufacturer; **APC** is specified for the UPS. Equivalent products may be proposed with documentation demonstrating equivalence and compatibility with the existing network.
- **Equipment requested:**
  - 1 ExtremeSwitching 5520 24-port switch (5520-24x); 2 Extreme Networks 350W AC power supplies (XN-ACPWR-350-FB); and 2 power cords (10061).
  - 18 10GBASE-LR SFP+ optical transceivers (10302); 2 1000BASE-T SFP RJ45 copper transceivers (10070H); and 2 0.5m 100G QSFP28 passive DAC cables (100G-DACP-QSFPZ5M).
  - 8 ExtremeSwitching 4220 48-port PoE+ switches (4220-48P-4X) with 8 power cords (10061); 1 ExtremeSwitching 4220 24-port PoE+ switch (4220-24P-4X) with 1 power cord (10061).
  - 1 ExtremeSwitching 5420F multi-gigabit PoE switch (5420F-16MW-32P-4XE), 1 1200W AC power supply (XN-ACPWR-1200W-FB), and 2 3m AC power cords (10138).
  - 10 0.5m 10G SFP+ passive DAC cables (10G-DACP-SFPZ5M) and 1 APC Smart-UPS 2200VA, rackmount 2U with network card (SRT2200RMXLA-NC).
- **Services and requirements:** Install and configure the listed equipment, including the labor and miscellaneous materials needed to complete installation. Equipment must be new and include a three-year manufacturer warranty. Any required operating license must be for five years and must not bundle support or management.

### Description

Lockland City School District is seeking bids for equipment (or equivalent) listed in the attached Lockland Equipment and Cost List, including switches, related components, and an uninterruptible power supply/battery backup with necessary software and licenses. Bidders must submit cost information using the completed Excel spreadsheet; proposals without it will not be considered. Equipment must be new and include a three-year manufacturer warranty, and proposed equivalents must include documentation establishing equivalence. Bidders must provide a SPIN or proof of application and document that they are authorized resellers; installation and configuration are included in the listed equipment requirements.

[View original listing](https://publicdata.usac.org/EPC/Prd/Form470/270002558/129876/22804895-USAC_FCC_FORM_470_APPLICATION_270002558_CERTIFIED.pdf)
