# SAM #12363N27Q4000

Lake Tahoe Forest Service cut-to-length harvesting, fuels treatment, and biomass removal

**Buyer:** USFS Stewardship Contracting Branch
**Posted:** October 23, 2026
**Respond By:** November 02, 2026
**Identifier:** 12363N27Q4000
**NAICS:** 113310, 115310, 113110

The USDA Forest Service’s Lake Tahoe Basin Management Unit seeks contractors for the Cowboy Hat cut-to-length forestry and hazardous-fuels project in the Lake Tahoe Basin.
- **Government buyer:** U.S. Department of Agriculture (USDA), Forest Service; Lake Tahoe Basin Management Unit, with the Stewardship Contracting Branch identified in the initial notice.
- **Project scope:** Approximately 545 acres total, with roughly 383 acres designated for treatment across Units 7, 8, 10, 20, and 21. Mandatory mechanical work covers 205 acres; optional hand treatments cover 177 acres.
- **Mandatory work:** Cut, process, forward, or pile forest material; mechanically treat fuels; remove an estimated 2,603 tons of biomass and slash; construct and decommission approximately 1.4 miles of temporary road; and perform road maintenance and erosion control.
- **Optional work:** Hand thinning and hand fuel treatment on 177 acres in Units 8 and 10.
- **Product:** 2,603 tons of combined softwoods biomass. The specifications include minimum size requirements, and the biomass offer has a stated minimum of $0.10.
- **Notable requirements:** Cut-to-length harvesting with forwarding; treatment of dead and down material and project-generated slash; specified snag and large-log retention; landing restoration; fire prevention and public-safety measures; and scaling by weight through an acceptable, Forest Service-approved third-party organization, with scaling costs borne by the contractor.
- **OEMs and vendors:** No equipment OEMs, product manufacturers, or named contractor vendors are identified.
- **Performance timing:** Anticipated to begin in early summer 2027, with work due by September 2027. Exact duration and option periods are not specified.

### Description

<p>This Sources Sought / Request for Information (RFI) is issued solely for market research and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. The Government will not reimburse accompanying costs.&nbsp;</p>

<p>Any answers or attachments provided are based upon the best information available at the time of the site visit and are subject to change.&nbsp;</p>

<p>1. Background &amp; Purpose</p>

<p>USDA Forest Service seeks capability statements from qualified vendors able to conduct forest thinning and vegetation treatments in areas burned by the Caldor Fire.&nbsp; The goals of the project are to reduce hazardous fuels and create conditions appropriate for reestablishing forested landscapes.&nbsp; Stewardship Authority shall be utilized to award an Integrated Resource Service Contract.&nbsp; In accordance with the approved NEPA decision, <strong>Cut-to-Length harvesting is the required logging mechanism</strong>.&nbsp; CTL typically consists of a harvester cutting and processing trees at the stump and a forwarder transporting the material to a designated landing location over a slash mat. <strong>The purpose of this SS/RFI is to gather information on vendor capabilities, invite prospective vendors to an organized site visit on 11/3/2026 before snow limits access, and provide draft documents to so that vendors can assess whether the opportunity is one to follow and potentially quote.</strong></p>

<p>2. Anticipated Scope of Work</p>

<p>The project objectives shall be met by performing the following service work.</p>

<ol>
	<li>Cut, process, and forward to landings or pile included biomass in 3 units across 205 acres.</li>
	<li>Within these units, cut standing dead conifer trees and forward to landings or pile. Treat fuels by mechanically masticating existing dead and down material, project-generated slash and brush. Remove slash and large dead and down to landings when necessary to meet the fuels treatment specification.</li>
	<li>Remove biomass and cull logs from landings to off-Forest disposal sites.</li>
	<li>Construct temporary road to facilitate thinning treatment and decommission the roads prior to demobilization.</li>
	<li>Perform road maintenance and erosion control on roads used for biomass removal or otherwise damaged by Contractor&rsquo;s operations.</li>
	<li>Perform hand thinning and piling if awarded.</li>
</ol>

<p>3. Place of Performance</p>

<p>The project is located on the Lake Tahoe Basin Management Unit in portions of Township 11N Range 18E Section 5, and Township 12N Range 18E Sections 32 and 33; Mount Diablo Meridian, approximately 0.5 miles southeast of the intersection of California Highway 89 and US Highway 50.</p>

<p>4. Period of Performance</p>

<p>Anticipated start date: Early Summer 2027. <strong>Performance deadline: 9/15/2027.</strong>&nbsp; This deadline is linked to grant funding expiration.</p>

<p><strong>5. Site Visit</strong></p>

<p>An organized site visit will occur on Tuesday, November 3, 2026, at 10:00 a.m. local time. &nbsp;Interested parties will meet in South Lake Tahoe, CA at the east end of Oneidas Street at the Forest Service Gate: 38&deg;51&#39;53.0&quot;N 119&deg;59&#39;40.7&quot;W.&nbsp; This location is south of Lake Tahoe Airport off of Pioneer Trail Road. &nbsp;Interested parties should email Karen Ruklic at karen.ruklic@usda.gov by 1:00 p.m. PT on November 2, 2026, if they plan to attend. &nbsp;</p>

<p>6. Requested Capability Statement Content</p>

<ul>
	<li>Company information (UEI, address, email, POC, business size and socio-economic status).</li>
	<li>Relevant experience focused on thinning via Cut-to-Length logging system and hazardous fuel reduction.</li>
	<li>Key personnel and crew qualifications.</li>
	<li>Equipment lists and mobilization capabilities.</li>
	<li>Past performance references.</li>
</ul>

<p>7. Response Instructions &amp; Due Date</p>

<p>Any information submitted by vendors to this this SS/RFI is voluntary. Responses should be submitted electronically to Karen Ruklic at karen.ruklic@usda.gov.&nbsp; All responses are due no later than Monday, November 2, 2026, at 1:00 p.m. PT.</p>

[View original listing](https://sam.gov/opp/4071f3fce4c54c12877c900c656467f5/view)
