# Edmond Ionwave #B26-022

Edmond Public Works Authority Danforth Tower Relocation and Water/Utility Construction

**Posted:** October 22, 2026
**Respond By:** November 18, 2026
**Identifier:** B26-022
**NAICS:** 237110, 237990

The Edmond Public Works Authority is seeking bids for the NE Complex Phase 1 Danforth Tower Relocation construction project in Edmond, Oklahoma.
- **Government buyer:** Edmond Public Works Authority, under the City of Edmond; the plans identify the Edmond Public Works Authority as the office. The project is identified as WC24-00005 and solicitation B26-022.
- **Scope:** Relocate and reinstall the existing 0.5-million-gallon elevated water tank, with associated water, sanitary sewer, storm drainage, electrical and SCADA work, site construction, access improvements, fencing, landscaping, and irrigation. Plans also describe tank demolition and re-erection, HVAC and security work, an approximately 800-CY detention pond, and pre- and post-construction video documentation.
- **Major quantities:** 1 elevated tank; 1,235 LF of 12-inch ductile iron water line; 2,591 LF of 8-inch PVC sanitary sewer; 514 LF of 18-inch Class IV RCP storm sewer; 24,000 SY of sod; and 1,927 SY of concrete pavement.
- **Other bid items:** Water valves, hydrants, fittings, sewer and storm structures, gates and fencing, asphalt paving, demolition, excavation, testing, traffic control, and site grading. An early-completion incentive is priced per day for up to 90 days.
- **Allowances:** $10,000 for project permitting, $200,000 for miscellaneous metal repairs, and $250,000 for the owner's contingency.
- **Notable requirements:** The tank and related improvements must be completed as shown in the plans and specifications. The bid scope includes asbestos removal and disposal, SWPPP preparation and implementation, hydrostatic testing and disinfection, sanitary sewer testing, and OSHA trench safety.
- **OEMs and vendors:** No product manufacturers, OEMs, brands, or vendor companies are named in the available bid information.

### Description

The sealed bid seeks construction work for the NE Complex Phase 1 Danforth Tower Relocation project. Scope includes installation of a 0.5 MG elevated storage tank and related water, sanitary sewer, storm sewer, electrical, instrumentation, site, paving, fencing, and landscaping work, as detailed in the bid documents. A mandatory in-person pre-bid meeting is scheduled for November 3, 2026, at the Coffee Creek Water Resource Recovery Facility in Edmond, Oklahoma; attendance is required to submit a bid. Bids are due November 18, 2026, at 2:00 PM CT, and questions are due November 11, 2026, at 2:00 PM CT.

[View original listing](https://edmondok.ionwave.net/PublicDetail.aspx?bidID=4959&SourceType=1)