# East Palo Alto Municode #BLD2026-0044

Construction of a Pilot Dog Park at Martin Luther King, Jr. Park

**Posted:** October 23, 2026
**Respond By:** November 20, 2026
**Identifier:** BLD2026-0044
**NAICS:** 237990, 238990, 238110, 238210, 238220

The City of East Palo Alto is seeking bids to build a pilot dog park at Martin Luther King, Jr. Park.
- **Government buyer:** City of East Palo Alto, Community & Economic Development Department and Public Works Department; project location is 435 Daisy Lane, East Palo Alto, California.
- **Scope:** Construct the dog park, including fence and gate work, site preparation, accessible circulation, amenities, and cleanup. The base bid includes an asphalt pathway; drawings also show a paved entrance and concrete paving as an alternate.
- **Specified products and named suppliers/OEMs:**
  - **Du Mor Site Furnishings** or equivalent: two 8-foot thermally modified red oak benches, model 34-80TMR (alternate), and one 22-gallon trash/recycling receptacle, model 70-22TMR-S. **Ross Recreational Equipment** is listed as the Du Mor representative.
  - **Dog Waste Depot** or equivalent: three direct-bury dog waste stations, model 404-B.
  - **Most Dependable Fountains** or equivalent: one surface-mounted drinking fountain with pet fountain, model 440SMSS (alternate), requiring a potable-water connection.
  - **Von Duprin:** specified gate panic hardware, part number OUT-98-LBE-626-RHR-4'-0\" 1609.
  - **Master Halco:** gate hinges at the top, middle, and bottom of gates.
  - **Native Seed Group** and **Pacific Coast Seed - North:** listed sources for the non-irrigated hydroseed mix.
- **Notable requirements and alternates:** Provide accessible routes; coordinate and protect existing utilities and park access; submit product cut sheets and shop drawings for review; and perform work to City standards. Alternates include clearing/grubbing and hydroseeding, two benches, a drinking fountain and its water connection, and concrete paving.

### Description

The City of East Palo Alto is soliciting bids for construction of a pilot dog park at Martin Luther King Junior Park. Work includes repaired and new fencing, a paved entrance, an asphalt pathway, benches, trash and recycling receptacles, dog waste stations, and site cleanup. The drawings also identify bid alternates, including concrete paving and a drinking fountain. A non-mandatory pre-bid meeting is listed for October 21, 2026, at 11:00 a.m. PST, and the bid deadline is November 19, 2026, at 4:00 p.m.

[View original listing](https://www.cityofepa.org/parksrec/page/pilot-dog-park-construction-0)
