# Utah Public Procurement Place U3P #CS27025

Layton Court HVAC Replacement: Daikin, Mitsubishi, and Woodford Equipment

**Posted:** October 22, 2026
**Respond By:** November 18, 2026
**Identifier:** CS27025
**NAICS:** 238220

Utah DFCM is seeking a qualified mechanical contractor to replace HVAC equipment and related systems at Layton Court.
- **Government buyer:** State of Utah, Division of Facilities Construction and Management (DFCM), for the Administrative Office of the Courts.
- **Project:** Layton Court AHU Replacement, DFCM Project #27339150, in Layton, Utah; estimated construction budget is $425,000.
- **Equipment and named manufacturers:**
  - **Daikin** DPSA055 rooftop air-handling unit (RTU), tag RTU-1. The plans’ equipment schedule lists quantity 2, while the solicitation describes replacement of one existing RTU; confirm the required quantity.
  - **Mitsubishi** PKA-AL18NL indoor split-system unit, quantity 1, and PUY-AK18NL outdoor condensing unit, quantity 1.
  - **Woodford** RHY2-1-MS freeze-proof roof hydrant, quantity 1, or approved equal.
  - One DFCM-standard equipment curb is required; no manufacturer or part number is specified.
- **Work:** Replace the RTU and cooling-only split system; complete associated duct, gas, electrical, refrigerant, condensate, curb, and roofing modifications; connect the roof hydrant to existing domestic water piping; and provide testing and balancing.
- **Notable requirements:** Roof modifications must be performed by a Carlisle- and DFCM-certified contractor to protect the existing roof warranty; Carlisle Roofing is identified as the warranty holder. Schedule disruptive work outside normal business hours, maintain building temperature setpoints during business hours, and perform RTU changeover over a long holiday weekend so it is operational by the next business day. Shutdowns require advance notice, and workers must submit BCI background checks before arriving on site.
- **Other named organizations:** WHW Engineering, LLC is identified as the project design provider. Bids are limited to Stage I-prequalified mechanical contractors.

### Description

The State of Utah Division of Facilities Construction and Management is requesting bids from Stage I prequalified mechanical contractors for construction work at the Layton Court in Layton, Utah. The work includes replacing an air handling unit/RTU and a cooling-only split AC system, providing a new equipment curb and roof hydrant connection to domestic water piping, and performing roof modifications through a Carlisle- and DFCM-certified contractor to maintain the roof warranty. The construction cost estimate is $425,000. Only eligible prequalified contractors may bid, and attendance at the mandatory bidder meeting is required. Work must be scheduled to minimize disruption, and all workers must submit a BCI background check before arriving at the site.

[View original listing](https://utah.bonfirehub.com/opportunities/259761)