# Clear Creek Independent School District Ionwave #2027.404 Addendum 2

Three-School Renovation Proposal: HVAC, Electrical, Fire Alarm, and Related Work

**Posted:** October 06, 2026
**Respond By:** November 03, 2026
**Identifier:** 2027.404 Addendum 2
**NAICS:** 236220, 238220, 238210

Clear Creek Independent School District is seeking proposals for renovations at three intermediate schools, with substantial HVAC, electrical, plumbing, security, and fire-alarm work.
- **Government buyer:** Clear Creek Independent School District (CCISD), Purchasing Department. Work is at Brookside, League City, and Space Center Intermediate Schools.
- **Named OEMs and vendors:** **Aurora** (acceptable hydronic-pump manufacturer); **Avigilon** (security camera); **CommScope** (powered fiber cable and PoE extender); **Notifier** (fire-alarm devices and components); and **Air Products** (AHU relays). No reseller is identified.
- **Products and quantities:** Avigilon camera, part number 32C-H5A-4MH-IR; CommScope powered fiber cable, PFC-S02L12F (quantity 1), and PoE extender, PFU-P-C-0-060-02 (quantity not specified); underground enclosure with Tier 22-rated lid (quantity 1); and Notifier fire-alarm devices including FPTI-951, FSP-951, FST-951R, NBG-12LX, FMM-101, FCM/FRM, and PSE-6 or PSE-10. Air Products/Notifier AHU relays are listed as MR-101/C. Quantities are not specified for most equipment. Aurora pumps are specified without a model or quantity.
- **Construction scope:** Renovations at three schools include AHU and exhaust/supply fan replacements, ductwork and hydronic piping revisions, controls updates, central-plant changes, electrical and lighting work, plumbing, and technology-related work. Revised plans also adjust chiller, boiler, water-heater, and electrical details.
- **Notable requirements:** Reuse the existing distributed 24VDC multiplex fire-alarm system and provide required devices, wiring, hardware, software, design, permitting, installation, testing, commissioning, coordination, and owner instruction. Replace new exhaust-fan roof curbs under an allowance, subject to project evaluation and Owner or Architect determination. The camera is to be mounted at 15 feet above finished floor unless noted otherwise; the specified powered fiber is OSP-rated OS2. Fencing, gates, and detention-pond work are included in Alternate No. 2.
- **Performance term:** Effective after Board approval through contract completion; no fixed duration or completion date is stated. This is not identified as an annual subscription.

### Description

Clear Creek Independent School District is seeking competitive sealed proposals for renovations at Brookside, League City, and Space Center Intermediate Schools. The solicitation includes project manuals, school-specific drawings, and addenda, with scope details and modifications provided in those documents. Base proposals are due November 3, 2026, by 2:00 PM CT, and alternate proposals are due the same day by 3:00 PM CT. Vendors must register and submit electronically through IonWave; mail-in proposals will not be considered.

[View original listing](https://ccisd.ionwave.net/PublicDetail.aspx?bidID=523&SourceType=1)
