# City of El Monte PlanetBids #147521

El Monte intersection signal upgrades and Santa Anita Avenue bike lane design

**Posted:** October 20, 2026
**Respond By:** November 18, 2026
**Identifier:** 147521
**NAICS:** 541330

The City of El Monte is seeking civil engineering design services for intersection safety upgrades and a Class II bike lane. 
- **Government buyer:** City of El Monte, Department of Public Works, Engineering Division.
- **Projects:** CIP 092 covers traffic signal and pedestrian improvements at four intersections: Main Street/Tyler Avenue, Ramona Boulevard/Tyler Avenue, Valley Boulevard/Tyler Avenue, and Valley Boulevard/Center Avenue. CIP 093 covers about 0.9 mile of Class II bike lane on Santa Anita Avenue between Valley Boulevard and Tyler Avenue.
- **Design services:** Surveying, utility research and coordination, community outreach, project meetings, preliminary and final plans, specifications and engineer’s estimates, right-of-entry/easement coordination, stormwater compliance, and CEQA environmental evaluation. Design submittals include 50%, 80%, 95%, and 100% PS&E stages.
- **Notable project requirements:** At the four intersections, replace signal heads with 12-inch LED vehicle heads and retroreflective bordered backplates; upgrade to LED countdown pedestrian heads and APS pedestrian push buttons; add battery backup to signal controller cabinets; and install continental crosswalk striping. Equipment quantities and part numbers are not specified.
- **Construction support:** Contingent, time-and-material engineering support based on an 80-hour allowance; the City may withdraw this item.
- **Named prospective firms:** ADVANTEC Consulting Engineers, Inc.; Albert A. Webb Associates; ALL AMERICAN BUILDING SERVICES; Allied Solutions; bureau veritas; dSantana Arquitectura; Granite Construction Company; IMEG Consultants Corp; Iteris, Inc.; JMDiaz, Inc.; MA Engineering; Psomas; RKA Consulting Group; Sikand Engineering Associates; and TAIT & Associates, Inc.
- **OEMs:** No manufacturers or OEMs are identified.

### Description

The City of El Monte is soliciting proposals for civil engineering design services for four signalized intersections and traffic signal and pedestrian improvements along Tyler Avenue and Valley Boulevard (CIP 092). The solicitation also covers design services for Santa Anita Avenue Class II bike lane improvements between Valley Boulevard and Tyler Avenue (CIP 093). The scope includes design work for both projects, with the RFP listing activities such as surveying, utility research and coordination, public engagement, preliminary and final design, and contingent engineering support during construction. The engagement duration is nine months.

[View original listing](https://vendors.planetbids.com/portal/43375/bo/bo-detail/147521)
