# City of Ankeny Questcdn #10400491

Ankeny traffic signal and turn-lane construction

**Posted:** October 20, 2026
**Respond By:** November 10, 2026
**Identifier:** 10400491
**NAICS:** 237310, 237130

The City of Ankeny is seeking a contractor to build a traffic signal and roadway improvements at North Ankeny Boulevard and NW Reinhart Drive.
- **Buyer:** City of Ankeny, Iowa; no sub-agency or procuring office is identified.
- **Scope:** Install a new traffic signal, add eastbound left-turn storage on NW Reinhart Drive, and widen North Ankeny Boulevard for a southbound right-turn lane. Related work includes excavation, subgrade and subbase preparation, median changes, sidewalks, pavement markings, fiber-optic infrastructure, restoration, traffic control, and mobilization.
- **Measured work:** Approximately 510 SY of 9-inch PCC Class C-SUD pavement, 385 SY of 8-inch PCC Class C-SUD pavement, 45 LF of storm sewer, one cast-in-place storm sewer intake, one storm sewer intake extension, and 200 LF of subdrain.
- **City-furnished equipment:** Combination traffic signal/lighting poles, mast-arm-mounted street-name signs, an ATC 48VDC cabinet with controller, conflict monitor and accessories, and fiber-optic cable, all for contractor installation. No manufacturers or product vendors are identified for these items.
- **OEMs and named vendors:** No OEMs are identified. QuestCDN VirtuBid is named as the electronic bid-submission platform.
- **Completion requirements:** Substantial completion within 60 working days; final completion within 10 working days after the punch list is provided. Liquidated damages are specified for late completion.
- **Estimated project value:** $607,214.50.

### Description

The project involves constructing a new traffic signal at N Ankeny Boulevard and NW Reinhart Drive, widening NW Reinhart Drive for additional eastbound left-turn lane storage, and widening N Ankeny Boulevard for a southbound right-turn lane. Work also includes pavement, storm sewer, subdrain, excavation, subgrade and subbase preparation, median modification, sidewalks, pavement markings, fiber optic infrastructure, surface restoration, and temporary traffic control. The City will furnish specified signal and lighting poles, signs, controller cabinet equipment, and fiber optic cable for contractor installation. Substantial completion is required within 60 working days, with full completion due within 10 working days after the punch list is provided.