# Ankeny Questcdn #10400491

Ankeny traffic signal and turn-lane construction at North Ankeny Boulevard and NW Reinhart Drive

**Posted:** October 20, 2026
**Respond By:** November 10, 2026
**Identifier:** 10400491
**NAICS:** 237310, 237130

The City of Ankeny is seeking construction of a new traffic signal and turn-lane improvements at North Ankeny Boulevard and NW Reinhart Drive.
- **Government buyer:** City of Ankeny, Iowa; local government. The provided notice does not identify a sub-agency or specific office.
- **Construction scope:** Build a traffic signal and widen NW Reinhart Drive for eastbound left-turn storage and North Ankeny Boulevard for a southbound right-turn lane. Related work includes roadway excavation and preparation, modified subbase, median changes, sidewalks, pavement markings, fiber-optic infrastructure, traffic control, and surface restoration.
- **Measured items:** About 510 SY of 9-inch PCC Class C-SUD pavement; 385 SY of 8-inch PCC Class C-SUD pavement; 45 LF of storm sewer; one cast-in-place storm sewer intake; one storm sewer intake extension; and 200 LF of subdrain.
- **City-furnished equipment:** The City is identified as furnishing combination traffic signal/lighting poles, mast-arm-mounted street name signs, an ATC 48VDC cabinet with controller, conflict monitor and accessories, and fiber-optic cable for contractor installation. No quantities or manufacturers are specified for these items.
- **OEMs and vendors:** No OEM or product brand is identified. QuestCDN is mentioned as the electronic bidding platform, not as a manufacturer or construction vendor.
- **Completion requirements:** Substantial completion is due within 60 working days; final completion is due within 10 working days after the punch list is provided.
- **Estimated project value:** $607,214.50.

### Description

The project involves constructing a new traffic signal at N Ankeny Boulevard and NW Reinhart Drive, widening NW Reinhart Drive for additional eastbound left-turn lane storage, and widening N Ankeny Boulevard for a southbound right-turn lane. Work includes pavement, storm sewer, subdrain, sidewalks, pavement markings, fiber optic infrastructure, traffic control, surface restoration, and associated construction. The City will furnish specified signal and fiber-optic equipment for contractor installation. Substantial completion is required within 60 working days, with full completion within 10 working days after the punch list is provided.