# CanadaBuys #AB-2026-06984

Pre-qualification for Bremner water main and valve chamber construction

**Posted:** October 20, 2026
**Respond By:** November 17, 2026
**Identifier:** AB-2026-06984
**NAICS:** 237110

Strathcona County is seeking qualified firms to build a water supply connection for the Bremner Development Area.
- **Buyer:** Strathcona County.
- **Requested work:** Construct a 400 mm-diameter water supply main connecting an existing County water line to the future Bremner Northwest Reservoir/Pumphouse.
  - Use both open-cut and trenchless installation methods as needed.
  - Construct a valve chamber north of the reservoir/pumphouse site.
- **OEMs and named construction vendors:** None identified. Bonfire is named as the portal where the pre-qualification documents are available, not as a construction vendor or OEM.
- **Procurement outcome:** This is a pre-qualification process; shortlisted firms may be invited to submit a quotation in a later request for quotation.
- **Schedule:** Estimated work duration is 11 months. No end date or option periods are stated.

### Description

Strathcona County is seeking qualified respondents for installation of a water supply line serving the Bremner Development Area. The work includes open-cut and trenchless installation of a 400 mm diameter water supply main between an existing County water line and the future Bremner Northwest Reservoir/Pumphouse, as well as a valve chamber north of the site. This pre-qualification process will short-list respondents for an anticipated Request for Quotation, which the County tentatively expects to issue in November 2026. The estimated contract period is 11 months, with a proposed start date of January 4, 2027.

[View original listing](https://canadabuys.canada.ca/en/tender-opportunities/tender-notice/ab-2026-06984)