Ankeny Westlawn Drive Phase 2A Street and Utility Improvements

**Posted:** October 20, 2026
**Respond By:** November 10, 2026
**Identifier:** 10400471
**NAICS:** 237310, 237110, 237990

The City of Ankeny is seeking a civil construction contractor for street, stormwater, water, and sanitary sewer improvements along SW Westlawn Drive.
- **Buyer:** City of Ankeny, Iowa; the notice identifies the city but no sub-agency or office.
- **Scope:** Westlawn Place Area Utility Improvements – Phase 2A, on SW Westlawn Drive from SW 4th Street to SW 2nd Street.
- **Major quantities:** Approximately 2,250 square yards of 7-inch PCC pavement; 10 storm sewer structures; 750 linear feet of storm sewer; 700 linear feet of water main; 60 linear feet of sanitary sewer; and 1,450 linear feet of subdrain.
- **Additional work:** Adjust sanitary sewer structures; perform excavation, subgrade preparation, and modified subbase work; remove and replace streets, driveways, and sidewalks; provide temporary water main and sidewalk work, traffic and erosion control, and temporary and permanent surface restoration.
- **OEMs and vendors:** No construction OEMs or prospective bidding vendors are named. QuestCDN is identified as the bid-document and electronic submission platform.
- **Completion requirements:** Substantial completion is required within 100 working days, with final completion within 10 working days after issuance of the punch list. Liquidated damages apply for late completion; a payment enhancement is available for qualifying timely completion.

### Description

The project replaces PCC street pavement, storm sewer, water main, and sanitary sewer along SW Westlawn Drive from SW 4th Street to SW 2nd Street in Ankeny. Work includes approximately 2,250 SY of 7-inch PCC pavement, storm sewer structures and piping, water and sanitary sewer work, subdrain, excavation, subgrade preparation, and removal and replacement of streets, driveways, and sidewalks. Associated work includes temporary utilities and sidewalk, traffic and erosion control, surface restoration, and other work needed to complete the project. Substantial completion is required within 100 working days, and full completion is due within 10 working days after the punch list is provided.