# CanadaBuys #CADC-2026-01

Charlottetown Convention Centre boardwalk replacement and reconstruction

**Posted:** October 19, 2026
**Respond By:** November 03, 2026
**Identifier:** CADC-2026-01
**NAICS:** 237990

The Government of Prince Edward Island, through the Charlottetown Area Development Corporation, is seeking bids to replace and reconstruct the boardwalk beside the Charlottetown Convention Centre.
- **Buyer and project context:** Government of Prince Edward Island; Charlottetown Area Development Corporation. Coles Associates Ltd. is named in the design documents and associated with the contracting authority contact.
- **Scope:** Remove existing decking, stringers, piles, and supports; build the replacement boardwalk east and south of the Convention Centre; adjust stairs and levels; and restore disturbed and grassed areas.
- **Specified materials and quantities:** Approximately 55 new 3-1/2-inch galvanized helical piles, with suitable existing piles allowed to be reused and extended; marine-grade Eastern Hem-Fir timber decking, stringers, and pile cap beams; and galvanized steel angles welded to existing sheet piles. Quantities for timber and other materials are not specified.
- **Other site work:** Provide drainage gravel, compacted structural fill, and a pressure-treated timber retaining wall wrapped in filter fabric; fill areas affected by subsurface erosion.
- **Notable requirements:** At least two borehole tests before construction; coordinate pile depths with test results and provide engineered documentation for installed piles. The design specifies a CL-15 maintenance-vehicle live load.
- **OEMs and suppliers:** No product manufacturers or suppliers are specified. Eastern Hem-Fir identifies a timber type, not a named OEM.

### Description

The solicitation is for replacement of the existing Convention Centre Boardwalk, located east and south of the Charlottetown Convention Centre in Prince Edward Island. Work includes removing the existing timber decking, stringers, piles and supporting components, and installing new helical piles and marine-grade timber beams, stringers and decking. The scope also includes welding steel supports to existing sheet piles, filling areas affected by subsurface erosion, leveling the boardwalk, and restoring disturbed surfaces and grassed areas. The estimated contract duration is seven months, with a proposed start date of November 16, 2026.

[View original listing](https://canadabuys.canada.ca/en/tender-opportunities/tender-notice/peig-18775)