# CanadaBuys #SK-HWY-H26035

Highway surfacing construction on Highways 2 and 102 in Saskatchewan

**Posted:** October 19, 2026
**Respond By:** November 05, 2026
**Identifier:** SK-HWY-H26035
**NAICS:** 237310

SaskBuilds and Procurement is seeking bids for highway surfacing construction on Highways 2 and 102 in Saskatchewan.
- **Government buyer:** Government of Saskatchewan, through SaskBuilds and Procurement.
- **Work requested:** Construct a surfacing structure across 9.20 km, from the junction with Far Reserve Road in Air Ronge to a point 6.28 km north of the junction with Brown Street in La Ronge.
- **Material quantity:** An estimated 17,250 tonnes of Asphalt Concrete In Place (EPS).
- **OEMs and vendors:** No product manufacturers, OEMs, or contractor vendors are identified in the notice.
- **Notable requirements:** A tender deposit equal to 5% of the total bid is required. Inquiries about the bid package must be submitted at least three business days before bidding closes.
- **Performance:** The work has two completion phases; no start date, total duration, or option periods are specified.

### Description

The procurement is for construction of a surfacing structure on Highway No. 2 and No. 102, from the junction with Far Reserve Road in Air Ronge to 6.28 km north of the junction with Brown Street in La Ronge, a total distance of 9.20 km. The estimated quantity is 17,250 tonnes of Asphalt Concrete In Place (EPS). Phase I is to be completed by March 31, 2027, and Phase II by November 30, 2027. Bidders must submit inquiries about the bid package at least three business days before closing; the tender deposit is 5% of the total bid.

[View original listing](https://canadabuys.canada.ca/en/tender-opportunities/tender-notice/sk-hwy-h26035)
