# Austin Afo #IFB 6100 CLMC1141

John Trevino Jr. Metro Park Phase I Development and Park Construction

**Posted:** October 19, 2026
**Respond By:** November 19, 2026
**Identifier:** IFB 6100 CLMC1141
**NAICS:** 236220, 237990, 238990, 561730

The City of Austin is seeking a contractor to develop Phase I of John Trevino Jr. Metro Park, including park facilities, landscaping, utilities, and specified manufactured products.
- Buyer: City of Austin, Capital Delivery Services, with the Parks & Recreation Department identified in project plans; Austin, Travis County, Texas.
- Project: John Trevino Jr. Metro Park – Phase I Development, CIP 11680.003, solicitation CLMC1141; estimated value is $6.5 million.
- Construction scope: Develop a wildflower meadow; remove invasive species; construct a 2,828-square-foot restroom/concession pavilion, picnic shelters, playground and nature-play amenities, trails and sidewalks, an entrance, access road, visitor parking, rain gardens, stormwater detention, and utility improvements; install landscaping and shade and ornamental trees.
- Named manufacturers/OEMs: **Classic Recreations** (two picnic pavilions) and **Texas Metal Tanks** (rainwater harvesting tank). No other product manufacturers or vendors are specified.
- Product quantities: one Classic Recreations Northwest Model 20 FT X 30 FT pavilion; one Classic Recreations Northwest Model 15 FT X 20 FT pavilion; and one Texas Metal Tanks 1,000-gallon galvanized steel rainwater tank, part number “GALVANIZED STEEL RAINWATER TANK 5' X 7'.”
- Notable requirements: Document compliance with Sustainable SITES requirements and achieve Sustainable SITES Certified designation. Plans also address accessibility, tree protection, erosion controls, fire access, onsite wastewater treatment, and heavy-duty entry-road and medium-duty visitor-parking pavement designs.
- Safety: Contractors and subcontractors must follow the project’s ROCIP safety requirements, including qualified safety staffing, training, job hazard analyses, inspections, emergency preparedness, and 100% fall protection at unprotected edges six feet or higher. Crane and barge activities require advance review.
- Schedule: Substantial completion is due within 300 calendar days after the Notice to Proceed; final completion is due within 60 calendar days after substantial completion.

### Description

The City of Austin is soliciting bids for Phase I development of John Trevino Jr. Metro Park. The work includes a wildflower meadow, invasive species removal, picnic shelters, playground amenities including nature play, trail and sidewalk connections, an entry point, access road, parking, rain gardens, trees, utility improvements, and a restroom. Responses are submitted through the eResponse portal, and a ROCIP compliance plan is required by the response deadline. The estimated amount is $6,500,000.

[View original listing](https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=143005)