# The Colony Planetbids #69-27-01

Phase 15A reconstruction of three City of The Colony streets and associated water, sewer, drainage, and lighting infrastructure

**Posted:** October 16, 2026
**Respond By:** December 03, 2026
**Identifier:** 69-27-01
**NAICS:** 237310, 237110, 237990

The City of The Colony is seeking a contractor for Phase 15A reconstruction of three streets and associated utility infrastructure.
- **Government buyer:** City of The Colony, Texas — Engineering Department and Purchasing Department.
- **Project:** Chapman Street (Augusta Street to Curry Drive), all of Independence Drive, and Bartlett Place (cul-de-sac to Clover Valley Drive).
- **Work requested:** Street and sidewalk reconstruction, water and sanitary sewer replacement, drainage and inlet work, retaining walls, street-light infrastructure, accessibility ramps, traffic control, pavement markings, erosion controls, and restoration.
- **Key scheduled quantities:** 14,800 SY of 6-inch reinforced concrete pavement, 39,496 SF of 4-inch concrete sidewalks, 4,469 LF of water line, and 3,525 LF of sanitary sewer. The project manual gives broader approximate scope figures of 16,200 SY of pavement, 40,000 SF of sidewalks, 4,400 LF of water line, 2,300 LF of 8-inch sewer, and 1,100 LF of 18-inch sewer.
- **Specified materials:** AWWA C900 PVC DR 18 Class 150 water pipe; PVC SDR 26 and SDR 35/PS46 sewer pipe; concrete paving and sidewalks; and flex base. No specific OEM, product brand, or vendor is named.
- **Notable requirements:** Build only one street at a time and construct Independence Drive last. Pedestrian facilities must comply with PROWAG, and construction must follow applicable TxDOT, NCTCOG, and City of The Colony standards.
- **Schedule and value:** Complete construction within 400 calendar days, including 20 inclement-weather days; a two-year maintenance period/bond follows acceptance. The stated opinion of probable construction cost is $4,980,000.

### Description

The City of The Colony seeks bids to reconstruct Chapman Street from Augusta Street to Curry Drive, the entire length of Independence Drive, and Bartlett Place from the cul-de-sac to Clover Valley Drive. Work includes mobilization, right-of-way preparation, traffic control, reinforced concrete pavement and sidewalks, sanitary sewer and water line work, street lighting, and related improvements. Bids are due December 3, 2026, at 2:00 p.m. local time and must be submitted electronically; paper bids are not accepted. The project manual states an opinion of probable construction cost of $4,980,000.

[View original listing](https://vendors.planetbids.com/portal/78679/bo/bo-detail/147391)