# Lee County Ionwave #B260359KCW Addendum 3

Construction of the Palm Creek Lower Filter Marsh and associated site improvements

**Posted:** September 29, 2026
**Respond By:** November 05, 2026
**Identifier:** B260359KCW Addendum 3
**NAICS:** 237990

Lee County is seeking a qualified contractor to build the Palm Creek Lower Filter Marsh, a wetland and water-quality improvement project in North Fort Myers, Florida.
- **Buyer:** Lee County Board of County Commissioners, through Lee County Procurement Management.
- **Project scope:** Construct an approximately 8.52-acre filter marsh within a larger site, including clearing and grubbing, excavation of about 46,100 cubic yards, off-site hauling and leveling of excess spoils, access and maintenance surfaces, pathways, plantings, and weir, diversion, and outfall structures. The bid schedule requests one complete-project total.
- **Planting quantities:** Marsh plantings total 13,550 across Zones A–C; upland plantings include 62 trees, 60 shrubs, and 1,675 ground-cover plants; low-maintenance tree islands include 36 shrubs and 125 ground-cover plants. Species, sizes, and zone quantities are itemized below.
- **Notable requirements:** Plant material must meet Florida nursery standards and come from an FDEP-approved local or regional source; substitutions require project engineer approval. The contractor must provide a rubber-tire or rubber-tracked backhoe with a 20- or 24-inch flat-edge bucket, an operator, and two laborers for an estimated four days of gopher tortoise excavation support. Planning assumptions are approximately 30 burrows and 15–20 tortoises; final needs depend on field conditions and permits. The contractor also installs silt fence after relocation. Applicable permits and hauling and site-operation restrictions apply.
- **Named organizations:** Lee County Board of County Commissioners and Lee County Procurement Management are the buyer; Johnson Engineering provided the environmental plan set; Tetra Tech engaged Ardaman & Associates, Inc. for preliminary geotechnical work; and Apex Companies, LLC conducted the updated protected-species survey and is identified for tortoise-permit and relocation activities. **No product OEMs, branded products, or product part numbers are specified.**
- **Other supporting work and permit information:** Attachment materials document preliminary geotechnical exploration, a protected-species survey, and permit items and costs. The County is responsible for tortoise permit application and relocation fees.
- **Schedule:** Construction is anticipated after County approval and issuance of a Notice to Proceed; an anticipated start is in early 2027. No completion date or overall construction duration is stated.

### Description

Lee County seeks bids from qualified contractors to construct a cellular pond and wetland network for the Palm Creek Lower Filter Marsh project in Lee County, Florida. The work covers approximately 8.52 acres and includes clearing and grubbing, excavating approximately 46,100 cubic yards of material, and transporting excess spoils off site. It also includes installing a gravel access road, stabilized maintenance surface, aggregate pathway, filter marsh plantings, and weir, diversion, and outfall control structures. Bids are due November 5, 2026, at 2:30 PM ET; submission is available electronically through Ion Wave or by hand delivery.