# SAM #1240LT27Q0008

Champion Creek Pit Development and Aggregate Crushing

**Buyer:** White River National Forest
**Posted:** October 16, 2026
**Respond By:** November 06, 2026
**Identifier:** 1240LT27Q0008
**NAICS:** 237210, 212321

The USDA Forest Service is seeking a contractor to develop Champion Creek Pit and produce road-surfacing aggregate in Custer County, Idaho.
- **Government buyer:** USDA Forest Service, Intermountain Region, Sawtooth National Forest; work is at Champion Creek Pit in the Sawtooth National Recreation Area.
- **Scope:** Develop the pit and access, clear and strip the site, remove overburden, prepare stockpile areas, crush and process aggregate to specified surface-course requirements, stockpile the material, and restore the site.
- **Quantities and schedule items:** Base bid includes 20,000 cubic yards of stockpiled aggregates (item 31401) and one lump-sum mobilization (item 15101). Option Item 1 adds 7,500 cubic yards of stockpiled aggregates (item 31401(1)); the schedule specifies measurement in 500-cubic-yard increments.
- **Notable requirements:** Protect the designated existing chip-material stockpile, fence, and gate; access the site via Forest Road 458; clean and inspect equipment for weeds and provide weed-free material certification; follow aggregate quality and gradation specifications; and comply with fire prevention, suppression, and site-safety requirements.
- **OEMs and vendors:** No manufacturers, OEMs, or commercial vendors are named in the provided notice or attachment summaries.
- **Performance period:** The stated contract duration is 58 days, with no option periods or annual subscription indicated.

### Description

<p><strong>Champion Creek Pit Rock Crushing</strong><br />
<br />
<strong>Description:</strong><br />
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.&nbsp; This announcement constitutes the only solicitation.&nbsp; Choose an item. are being requested and a separate written solicitation will not be issued.&nbsp;</p>

<p>This acquisition&nbsp;is set-aside for small business concerns.&nbsp; The applicable North American Industry Classification Standard Code is <strong>212321 - Construction Sand and Gravel Mining.</strong>&nbsp; The small business standard is <strong>No more than 500 employees</strong>.&nbsp; This acquisition is <strong>Firm Fixed Price</strong>.&nbsp; All responsible sources may submit a quotation which will be considered by the agency.</p>

<p><strong>General Information:</strong><br />
1.0 Scope of Work<br />
This project will develop the Champion Creek Pit for crushed aggregate surfacing material for use on forest roads. This work<br />
includes all required clearing, grubbing, topsoil stripping, overburden removal, material processing/crushing, material<br />
stockpiling, and restoration activities when finished. The Champion Creek Pit is located on the Sawtooth National Recreation<br />
Area of the Sawtooth National Forest.<br />
&nbsp;<br />
<strong>Project Location:</strong><br />
From the Sawtooth NRA Ranger Station, travel south along State Highway 75 for approximately 13.5 miles. Turn left on<br />
Forest Road 70458, veer left, and continue about<br />
<br />
<strong>IAW: Solicitation and all applicable specifications, attachments and any amendments<br />
to include but not limited to;</strong><br />
&nbsp; &nbsp; &nbsp;A04_Section C Champion Pit Crushing<br />
&nbsp; &nbsp; &nbsp;A04a_Schedule Of Items Section Champion Pit Crushing<br />
&nbsp; &nbsp; &nbsp;A04b_FP14 Supplemental Specs Champion Pit Crushing<br />
&nbsp; &nbsp; &nbsp;A04c_Design Drawings Champion Pit Crushing<br />
&nbsp; &nbsp; &nbsp;A06_Fire Precautions Plan</p>

<p><strong>Award Schedule:</strong><br />
&nbsp; &nbsp; &nbsp;Posting: 10/16/2026<br />
&nbsp; &nbsp; &nbsp;Site Visit: 10/28/2026 @ 1300 MST<br />
&nbsp; &nbsp; &nbsp;Q&amp;A Due Date: 10/30/2026<br />
&nbsp; &nbsp; &nbsp;Quotes Due Date: 11/05/2026<br />
&nbsp; &nbsp; &nbsp;Anticipated Award Date: 11/16/2026<br />
&nbsp; &nbsp; &nbsp;POP: 05/03/2027 &ndash; 06/30/2027 = 58 days</p>

[View original listing](https://sam.gov/opp/62facea8bef346c9833de1663487df50/view)
