# Charlotte Bonfire #FY27-ITBCON-31

Design and construction of the Ashe Plantation wastewater lift station

**Posted:** October 15, 2026
**Respond By:** November 12, 2026
**Identifier:** FY27-ITBCON-31
**NAICS:** 237110, 237990

Charlotte Water seeks a design-and-construction team for the Ashe Plantation wastewater lift station project in Mecklenburg County, North Carolina.
- **Buyer:** Charlotte Water, serving Charlotte and Mecklenburg County, North Carolina; no further sub-agency or office details are provided.
- **Requested work:** Design, bidding, and construction of one new duplex wastewater lift station, reusing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant.
- **Capacity and connection:** The station must provide 320 gallons per minute of capacity and connect to an 8-inch forcemain that conveys wastewater to the Goose Creek basin.
- **Additional requirement:** Decommission the existing package treatment plant.
- **OEMs and vendors:** None are named; no equipment models or part numbers are specified.
- **Potential competing providers:** Garney Construction, Kiewit Infrastructure South Co., Wharton-Smith, Inc., Carollo Engineers, Inc., and Jacobs Engineering Group Inc. are examples of companies that provide comparable water and wastewater infrastructure services.

### Description

The project involves the design, bidding, and construction of a new lift station using the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed duplex lift station will have a capacity of 320 gallons per minute and connect to an 8-inch forcemain. The infrastructure will convey wastewater to the Goose Creek basin, and the existing package treatment plant will be decommissioned.

[View original listing](https://charlottenc.bonfirehub.com/opportunities/258793)
