# Charlotte Bonfire #269-2027-041

Install owner-provided EV chargers and electrical infrastructure at CMPD Westover

**Posted:** October 15, 2026
**Respond By:** November 12, 2026
**Identifier:** 269-2027-041
**NAICS:** 238210

The City of Charlotte is seeking installation of owner-provided EV chargers and supporting electrical infrastructure at the CMPD Westover site in Charlotte, North Carolina.
- **Government buyer:** City of Charlotte — City Procurement; project site: CMPD Westover, Charlotte, Mecklenburg County, North Carolina.
- **Requested equipment:**
  - Install 6 owner-provided dual-port, 80-amp Level II EV chargers and required power distribution equipment.
  - Install 1 owner-provided 200 kW DC fast charger and provide the electrical service and equipment needed to power it.
- **Notable infrastructure requirements:**
  - Design Level II infrastructure to accommodate 12 chargers in total, including the 6 currently being installed.
  - Provide space for a future panel and capped, watertight conduit runs to future charger locations.
  - Existing equipment not identified for replacement is to remain.
- **OEMs and vendors:** No charger manufacturers, OEMs, or vendors are named in the opportunity. The chargers are owner-provided.
- **Period of performance:** Not specified in the available information.

### Description

Install six new dual-port, 80-amp Level II EV chargers and the required power distribution equipment. The design must accommodate a future total of twelve Level II chargers, including space for a future panel and capped, watertight conduit runs to future charger locations. The work also includes adding one 200 kW DC fast charger and the electrical service and equipment needed to feed it; other existing equipment is to remain. Chargers are owner-provided and contractor-installed.

[View original listing](https://charlottenc.bonfirehub.com/opportunities/258742)
