# SAM #80NSSC26946800Q

NASA request for turbine flowmeters, CEESI calibration, and signal conditioners for an ESR panel modification

**Buyer:** NASA Shared Services Center
**Posted:** October 15, 2026
**Respond By:** October 22, 2026
**Identifier:** 80NSSC26946800Q
**NAICS:** 334514, 334519, 541380, 334516

NASA is seeking instrumentation and calibration to restore Orion scrubber purge capability and modify an ESR panel.
- Government buyer: NASA Shared Services Center; delivery to the Logistics Warehouse, NASA John F. Kennedy Space Center, Exploration Ground Systems (EGS), Kennedy Space Center, Florida. Work involves the Vehicle Assembly Building, Mobile Launcher, and Multi-Payload Processing Facility.
- Scope: Support restoration of Orion scrubber purge capability using existing ML2 BAIR hardware and integrate redundant flow measurement into the Cabin Air Supply Panel for direct SCFM measurement and real-time firing-room data.
- Requested items:
  - 6 turbine flowmeters, part number FT-08AER1GEA-1.
  - 6 CEESI calibrations, part number 90-88669-610.
  - 6 signal conditioners, part number TWA-A-9-00-IS.
- Technical requirements include air/gas service, flowmeter pressure and Reynolds-number calibration, and signal conditioning with a 4–20 mA output and specified hazardous-location protections. The flowmeter must follow the latest revision of KSC drawing 79K03436.
- Named company: CEESI, identified with the calibration item. No flowmeter or signal-conditioner manufacturer is identified in the provided materials.

### Description

<p>See attached RFQ and SOW</p>

<p></p>

<p>ADDRESS:&nbsp;</p>

<p>Logistics Warehouse</p>

<p>NASA &ndash; John F. Kennedy Space Center</p>

<p>Exploration Ground Systems (EGS)</p>

<p>Kennedy Space Center, FL 32899</p>

<p>&nbsp;</p>

[View original listing](https://sam.gov/opp/c389523b4586420999fcad8418c3f5cd/view)
